city code
Subdividers Ordinance
Page 90 of 158
Text from the PDF text layer; check the PDF for anything that matters. 5. All information and evidence submitted in applications to indicate
conformity to performance standards must constitute a certification and
an agreement on the part of the applicant that the proposed use can
and will conform to such standards at all times.
D. Administrative Options
The Planning and Zoning Commission may approve the establishment of the
use, building, or structure, if all pertinent provisions of this Ordinance, and other
applicable City ordinances are complied with. If the Planning and Zoning
Commission determines that the proposed use, building or structure does not
comply with performance standards, they may inform the applicant that either
more information is necessary or that an independent engineering analysis of the
proposed use, building, or structure is required prior to final City approval.
E. Need for Independent Engineering Analysis
If the Planning and Zoning Commission determines that reason exists to doubt
compliance with any applicable performance standard provision , a professional
engineer of the city’s choosing and acceptable to the petitioner may be asked to
analyze the prospects for compliance. The cost of the analysis must be paid by
the applicant.
F. Use of Independent Engineering Analysis
Upon submission of an independent engineering analysis authorized by the City,
the Planning and Zoning Commission may authorize establishment of the use,
building, or structure if the independent analysis confirms probable compliance
with this provision and if all other applicable provisions of this and other city
ordinances are satisfied. If the independent engineering analysis indicates that
the proposed use, building, or structure is not likely to comply with this provision,
then the application must be denied until such time that the proposal is able to
comply fully with the requirements.
G. Appeal of Administrative Determination
Action, or a lack of action by the Planning and Zoning Commission, with
reference to these performance standards may be appealed to the Board of
Adjustment. In instances when no action has been taken by the Planning and
Zoning Commission within 120 days after formal filing of the application, the lack
of action may be appealed to the Board of Adjustment.
H. Continued Enforcement
1. The Planning and Zoning Commission must investigate any purported
violation of performance standards. Uses, buildings, or structures
lawfully established prior to the effective date of this Ordinance and
subject to performance standards existing at that time may be found to
be in violation with those previously applicable standards. Alleged
violations may be brought to the Planning and Zoning Commission’s
attention by anyone. If a violation is alleged and the Planning and
Zoning Commission finds probable cause of a violation, the City must
inform the suspected violator and the violator must initiate an
independent engineering analysis within 14 days of notice by the City.
Administrative determinations made in conjunction with the analysis
may be appealed in the same manner as set forth in this Ordinance for
appeals.
90
Adopted November 14, 2007