Page 40 of 158

Text from the PDF text layer; check the PDF for anything that matters.
Table R-M R-M MINIMUM LOT REQUIREMENTS Minimum Lot Size Requirements Minimum Yard Requirements Side Yard Side Side Street Front Yard Yard Side, Rear Frontage Yard One Two Corner Yard Maximum R-M Width Depth Area Depth Story Story Lot Depth Height (ft) (ft) (sq ft) (ft) (ft) (ft) (ft) (ft) Permitted Principal 1 1/2 Uses and stories or Structures 60 100 6,000 15 10 15 15 15 15 ft Permitted Accessory 1 1/2 Uses and stories or Structures 80 100 10,000 40 20 20 25 40 15 ft 40 Adopted November 14, 2007

Sources

  • citycode: Subdividers Ordinance (Tiffin-Zoning-Ordinance-2007-287.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.