city code
Subdividers Ordinance
Page 19 of 158
Text from the PDF text layer; check the PDF for anything that matters.4. Rules for Determination of Boundaries: Where uncertainty exists as
to the boundaries of districts as shown on the Official Zoning Map, the
following rules apply:
a. Boundaries indicated as approximately following the centerline
of streets, highways, or alleys must be construed to follow
such centerlines;
b. Boundaries indicated as approximately following platted lot
lines must be construed as following such lot lines;
c. Boundaries indicated as following corporate limits must be
construed as following corporate limits;
d. Boundaries indicated as following railroad lines must be
construed to be midway between the main right-of-way
e. Boundaries indicated as following shore lines must be
construed to follow such shore lines, and in the event of
change in the shore line, boundaries must be constructed to
move with the actual shore line; boundaries indicated as
approximately following the center lines of streams, rivers,
canals, lakes, or other bodies of water must be construed to
follow those center lines;
f. Boundaries indicated as parallel to or extensions of features
indicated in subsections (a) through (e) must be so construed.
Distances not specifically indicated on the Official Zoning Map
must be determined by dimensions shown on the map, or in
the absence of dimensions, by the scale of the map;
g. In the case of further uncertainty, or where physical or cultural
features existing on the ground are at variance with those
shown on the Official Zoning Map, or in other circumstances
not covered by subsections (a) through (f) above, the Board of
Adjustment must interpret the district boundaries.
19
Adopted November 14, 2007
Sources
- citycode: Subdividers Ordinance (Tiffin-Zoning-Ordinance-2007-287.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.