Page 3 of 13
Text from the PDF text layer; check the PDF for anything that matters. 3. public improvements will be constructed in accordance with
The
approved construction plans and accepted by the City or, in the event the Subdivider
requests and the City agrees to the construction of the public improvements after final
plat approval, the Subdivider has complied with the security requirements set forth in
12 of the Tiffin Subdivision Ordinance and Section 7 of this Agreement; and
Section 5.
4. The Subdivider enters into and abides by this Agreement.
13. The Subdivider further agrees that this Agreement shall be a covenant running
with the land and shall be binding on the present and future owners of the Subdivision.
C. The Subdivider grade or otherwise disturb the earth, remove trees,
may not
construct sanitary mains,
sewer storm mains, water mains, streets, utilities, public or
sewer
private improvements or
any buildings until the following conditions have been satisfied:
1. This Agreement has been fully executed by both parties, filed with the
City Clerk, and approved by the City Council;
2. The. Subdivider has complied with the erosion control and grading
provisions set forth in Section 5 of this Agreement; and
3. All permits required by local, state, and federal law have been applied for
and issued by the appropriate authority.
4. A11 necessary construction permits have been applied for and issued
by the City.
SECTION 3. DEVELOPMENT REQUIREMENTS AND PUBLIC IMPROVEMENTS
A. Development Standards. The Subdivision shall be developed according to the plat
as approved by the City and according to the plans and specifications as approved by the City.
All construction plans shall be approved before the commencement of any work in accordance
with the plat. There shall be no variance from the preliminary plat, or from the construction plans
and specifications, unless approved in writing by the City.
B. Public Improvement Standards. All improvements and facilities described in this
Agreement shall be constructed and installed by the Subdivider according to the plans,
specifications, ordinances and standards of the City and in accordance with all applicable federal
and state laws and regulations. All required inspections shall be performed by the City Engineer
or
designate. Said inspections shall consist of inspection of the work in progress but shall not
relieve or release the Subdivider from its responsibility to construct said improvements and
facilities pursuant to the agreed upon plans and specifications. These improvements and facilities
include but are not limited to public water system; sanitary sewer system; storm sewer and
drainageway system; site grading; underground utilities; setting for lot and block monuments;
and surveying and staking.
C. Standard Recuirements. Further, the Subdivider agrees that:
2