resolution
Resolutions-2025-010
Page 4 of 18
Text from the PDF text layer; check the PDF for anything that matters. 1. The above recitals are true and correct.
2. The Roundabout: The Roundabout described in Exhibit A, or something of substantially
similar design, will be built (" Roundabout Project"). It will proceed as a North Liberty project for
of the costs of the Roundabout
purposes of design, construction, etc. North Liberty will pay 50%
of the costs of the Roundabout Project. Such costs include but are
Project and Tiffin will pay 50%
not limited to engineering fees, paving, water main, sanitary sewer main, storm sewer, drainage
way, sidewalk, underground utilities, overhead street lighting, curb and gutter, landscaping and
streetscape materials and plantings, and costs of acquiring necessary right of way and easements
for the project.
Coralville will convey back to the Trust any necessary portion of the property that was deeded
by the Trust to Coralville once Tiffin has secured the easements necessary for the construction of
the Jasper Avenue Project to be located south of the Roundabout as outlined in Paragraph 3 of this
Settlement Agreement. Rarick and Trust will then convey any of its land necessary for the
Roundabout Project, including all necessary easements, to the appropriate county or municipal
jurisdiction within which such land lies. Rarick and Trust accept payment for the same based upon
the 000 per acre for conveyance
following schedule: $ 60, of right of way or other permanent
easements except utility easements, 10% 000)per acre per year for construction
of that amount ($ 6,
000 per acre for permanent utility easements.
easements, $ 30,
Tiffin, Coralville, and North Liberty will execute the attached 28E agreement simultaneously
with the execution of this Settlement Agreement.
3. Jasper Avenue: The road referred to as south Jasper Avenue, that portion of Jasper Avenue
paved to its intersection
that is south of the proposed roundabout, will be built out/ with Andersen
Place (" Jasper Project"). It will proceed as a Coralville project for purposes of design, construction,
etc. Coralville and Tiffin will execute the attached 28E agreement simultaneously with the
execution of this Settlement Agreement, regarding construction of the Jasper Project south of
s south boundary to connect with Andersen Place.
Coralville'
Upon execution of this Settlement Agreement and accompanying 28E Agreements, Tiffin will
start the process to convey to Coralville all of its right-
of-
way on south Jasper Avenue, except for
its portion of right-
of-
way that will constitute the west -side of the splitter island where the
roundabout will connect to south Jasper Avenue. The parties estimate the length of this retained
portion of right-
way
of- to be approximately 100 feet, but it will be subject to the final design of