Resolution 2026-002 – A Resolution Approving the Developer’s Agreement with Grove Park Row Homes, LLC, for the Grove Park Planned Development Overlay Site District

Open the PDF

Page 5 of 11

Text from the PDF text layer; check the PDF for anything that matters.
SECTION 3. TIME OF PERFORMANCE Construction of the first building on the Site must commence within two (2) years from the date of City approval of OPD Site District, or the approval of the OPD Site District shall be null and void without any action by the City Council. Owner may, however, request an extension of time from the City. SECTION 4. PUBLIC UTILITIES Owner agrees that it will obtain any necessary concurrence of utility or other easements from appropriate utility companies. Owner agrees that it will provide for the continuation of all required water, sanitary sewer and storm drainage facilities. Owner agrees that it will connect and use existing public water supplies in accordance with the Tiffin Municipal Code and that Owner will provide a plan outlining the drainage of the land and indicating the manner in which the drainage will be accommodated and will connect to the existing storm water sewer systems when available in accordance with the plan approved by the City Engineer. SECTION 5. EROSION CONTROL AND GRADING A. Erosion Control. Before any utility construction is commenced or building permits are issued, Owner shall design and implement an erosion control plan which shall be reviewed and approved by the City. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. All seeded areas shall be fertilized, mulched and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion, and, if Owner does not comply with the erosion control plan or any supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion and assess the costs of such action to Owner or the property, or both. The City will endeavor to notify Owner in advance of any proposed action, but failure of the City to do so will not affect Owner's and City's rights or obligations hereunder. B. Grading. No grading of any nature may occur on this property until a grading plan is implemented by Owner and approved by the City. Within ninety (90) days after the completion of any grading, Owner shall provide the City with an "as-constructed" grading plan and a certification by registered land surveyor or engineer that all ponds, swales and ditches, if any, have been constructed in accordance with the plans approved by the City. SECTION 6. MISCELLANEOUS A. The City may, at its option, refuse to allow construction or development work in the OPD until Owner complies with the appropriate law or regulation. Upon the City's demand, Owner shall cease work until there is compliance. B. Third parties shall have no recourse against the City or Owner under this Agreement. 4

Sources

  • revize: Attachment (ctttJ2FTzyYv8IcP0uFjHP1SjMvqsQ.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (I-2 - Resolution 2026-002 - Approving Developer's Agreement for Grove Park Row Homes.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: I-2 Resolution 2026-002 – A Resolution Approving the Developer’s Agreement with Grove Park...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.