resolution

Resolutions-2020-034

Dated May 13, 2020 17 pages Res. 2020-034, Res. 2020-033, Res. 2020-035

Open the PDF Searchable (OCR) PDF

Page 10 of 17

Text read by the vision model; check the PDF for anything that matters.
NOTICE TO PROPERTY OWNERS NOTICE IS GIVEN: That there are now on file for public inspection in the office of the City Clerk of the City of Tiffin, Iowa (the “City”), a proposed resolution of necessity, an estimate of cost and a plat and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council, for a street improvement, described in general as the Original Town Urbanization Project: Phase Two (the “Project”), of the type and in the location as follows: The Project shall consist of the installation of storm sewer, storm sewer intakes, Full Depth Reclamation, 6-inch Hot Mix Asphalt (HMA) pavement, 36-inch curb & gutter, sidewalks, 6-inch Portland Cement Concrete (PCC) driveway, street lighting; traffic control and other associated appurtenances and miscellaneous work items. The Project shall be constructed on and along the following segments of street in the City of Tiffin, Johnson County, Iowa: • Second Street, from a point just east of its intersection with College Street on the west, to and including its intersection with East Brown Street on the east; • Grant Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north; • Main Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north; and • Summerhays Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north. The Project shall also include watermain replacement, which shall be constructed on and along the following segments of street: • Second Street, from College Street to Main Street; and • Main Street, from Second Street to U.S. Highway 6/Marengo Road. It is considered that the properties abutting the above-described segments of street to be improved will be specially benefitted by this improvement and should be specially assessed. All as shown on the preliminary special assessment plat and schedule for the Project which are now available for inspection in the office of the City Clerk The City Council will meet at 7:00 o’clock p.m., on June 2, 2020, at the Springmier Library located on the second floor of the Clear Creek Amana Middle School at 311 W Marengo Road, Tiffin, Iowa. At which time the owners of the property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot or the final adoption of a resolution of necessity. A property owner will be deemed to have waived all objections unless at the time of hearing the property owner has filed objections with the City Clerk. Abigail Hora City Clerk

Sources

  • laserfiche: Resolutions-2020-034 (Resolutions-2020-034.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.