resolution
Resolutions-2020-033
Page 8 of 17
Text read by the vision model; check the PDF for anything that matters.RESOLUTION NO. 2020-035
Proposed Resolution of Necessity
WHEREAS, the City Council of the City of Tiffin, Iowa (the “City”), has adopted a preliminary resolution in accordance with Section 384.42 of the Code of Iowa, covering the Original Town Urbanization Project: Phase Two (the “Project”); and
WHEREAS, pursuant thereto, the Project Engineers have prepared preliminary plans and specifications, an estimated total cost of the work and a plat and schedule, including the valuation of each lot as determined by this City Council, and the same have been duly adopted and are now on file with the City Clerk;
NOW, THEREFORE, It Is Resolved by the City Council of the City of Tiffin, Iowa:
Section 1. It is hereby found and determined to be necessary and for the best interest of the City and its inhabitants to proceed with the Project, and to assess a portion of the cost to the property benefited thereby.
Section 2. The Project shall consist of the installation of storm sewer, storm sewer intakes, Full Depth Reclamation, 6-inch Hot Mix Asphalt (HMA) pavement, 36-inch curb & gutter, sidewalks, 6-inch Portland Cement Concrete (PCC) driveway, street lighting; traffic control and other associated appurtenances and miscellaneous work items. The Project shall be constructed on and along the following segments of street in the City of Tiffin, Johnson County, Iowa:
• Second Street, from a point just east of its intersection with College Street on the west, to and including its intersection with East Brown Street on the east;
• Grant Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north;
• Main Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north; and
• Summerhays Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north.
The Project shall also include watermain replacement, which shall be constructed on and along the following segments of street:
• Second Street, from College Street to Main Street; and
• Main Street, from Second Street to U.S. Highway 6/Marengo Road.
Section 3. It is considered that the properties abutting the above-described segments of street to be improved will be specially benefitted by this improvement and should be specially assessed.
Sources
- laserfiche: Resolutions-2020-033 (Resolutions-2020-033.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.