resolution

Resolutions-2020-033

Dated May 13, 2020 17 pages Res. 2020-033, Res. 2020-034, Res. 2020-035

Open the PDF Searchable (OCR) PDF

Page 3 of 17

Text read by the vision model; check the PDF for anything that matters.
RESOLUTION NO. 2020-033 Preliminary resolution pursuant to Section 384.42 of the Iowa Code covering the Original Town Urbanization Project: Phase Two WHEREAS, it is deemed advisable by the City Council of the City of Tiffin, Iowa (the “City”) that the Original Town Urbanization Project: Phase Two (the “Project”) be constructed in the City in accordance with the provisions of Chapter 384 of the Code of Iowa, and that a portion of the cost of the Project be assessed to the property benefited thereby; and WHEREAS, the City has arranged for engineering services for the Project with Hart-Frederick Consultants PC (the “Project Engineers”); NOW, THEREFORE, Be It Resolved by the City Council of the City of Tiffin, Iowa, as follows: Section 1. The Project shall consist of the installation of storm sewer, storm sewer intakes, Full Depth Reclamation, 6-inch Hot Mix Asphalt (HMA) pavement, 36-inch curb & gutter, sidewalks, 6-inch Portland Cement Concrete (PCC) driveway, street lighting; traffic control and other associated appurtenances and miscellaneous work items. The Project shall be constructed on and along the following segments of street in the City of Tiffin, Johnson County, Iowa: • Second Street, from a point just east of its intersection with College Street on the west, to and including its intersection with East Brown Street on the east; • Grant Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north; • Main Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north; and • Summerhays Street, from and including its intersection with Second Street on the south, to a point just south of its intersection with Third Street on the north. The Project shall also include watermain replacement, which shall be constructed on and along the following segments of street: • Second Street, from College Street to Main Street; and • Main Street, from Second Street to U.S. Highway 6/Marengo Road. Section 2. It is considered that the properties abutting the above-described segments of street to be improved will be specially benefitted by this improvement and should be specially assessed.

Sources

  • laserfiche: Resolutions-2020-033 (Resolutions-2020-033.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.