resolution
Resolutions-2018-022
Page 6 of 20
Text read by the vision model; check the PDF for anything that matters.agrees that it will connect and use existing public water supplies in accordance with the Tiffin Municipal Code and that the Developer will provide a plan outlining the drainage of the land and indicating the manner in which the drainage will be accommodated and will connect to the existing storm water sewer systems when available in accordance with the plan approved by the City Engineer.
SECTION 5. EROSION CONTROL AND GRADING
A. Erosion Control. Before any utility construction is commenced or building permits are issued, the Developer shall design and implement an erosion control plan which shall be reviewed and approved by the City. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. All seeded areas shall be fertilized, mulched and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion, and, if the Developer does not comply with the erosion control plan or any supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion and assess the costs of such action to the Developer or the property, or both. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer’s and City’s rights or obligations hereunder.
B. Grading. No grading of any nature may occur on this property until a grading plan is implemented by the Developer and approved by the City. Within ninety (90) days after the completion of any grading, the Developer shall provide the City with an “as-constructed” grading plan and a certification by registered land surveyor or engineer that all ponds, swales and ditches, if any, have been constructed in accordance with the plans approved by the City.
SECTION 6.
Reserved
SECTION 7. PUBLIC IMPROVEMENTS AND ASSESSMENT WAIVER
A. If all the public improvements and facilities, except for sidewalk construction deferred in accordance with Section 3(C)(4), are not installed and accepted by the City prior to approval of the final plat, the Developer is required to either deposit in escrow or file a surety bond with the City in the amount equal to the estimated costs of the public improvements and facilities.
B. Developer agrees to provide to the City, as per Section 3.05 of the Tiffin Subdivision Ordinance, proper maintenance bonds satisfactory to the City, so as to insure that for a period of three (3) years from the date of acceptance of any improvement, the Developer shall be responsible to maintain such improvement in good repair. The City may, at its sole discretion, accept alternative sureties to maintenance bonds to insure the workmanship of the improvements accepted by the City.
C. In the event the Developer, its assigns or successors in interest, should sell or
Sources
- laserfiche: Resolutions-2018-022 (Resolutions-2018-022.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.