resolution
Resolutions-2017-094
Page 8 of 26
Text read by the vision model; check the PDF for anything that matters.RESOLUTION NO. 2017-095
Proposed
Resolution of Necessity
WHEREAS, the City Council of the City of Tiffin, Iowa (the “City”), has adopted a preliminary resolution in accordance with Section 384.42 of the Code of Iowa, covering the 2017 Original Town Urbanization Project (the “Project”); and
WHEREAS, pursuant thereto, the Project Engineers have prepared preliminary plans and specifications, an estimated total cost of the work and a plat and schedule, including the valuation of each lot as determined by this City Council, and the same have been duly adopted and are now on file with the City Clerk;
NOW, THEREFORE, It Is Resolved by the City Council of the City of Tiffin, Iowa:
Section 1. The Project shall include pulverizing and grading of the existing asphalt street; storm sewer installation; construction of 5-foot wide sidewalks, 36-inch wide PCC curb and gutter, 5-inch thick hot mix asphalt street and PCC driveway approaches; installation of street lights; and undertaking associated incidental improvements.
The Project shall be constructed on and along the following segments of streets in the City of Tiffin, Johnson County, Iowa:
(1) College Street from its intersection with West Third Street on the north to a point situated 180 feet north of its intersection with Railroad Street on the south; (2) Railroad Street from a point situated 60 feet east of its intersection with College Street on the west to, and including, its intersection with Main Street on the east; (3) Grant Street from its intersection with West Second Street on the north to, and including, its intersection with Railroad Street on the south; (4) Main Street from its intersection with West Second Street on the north to, and including, its intersection with Railroad Street on the south; and (5) Summerhays Street from its intersection with West Second Street on the north to the termination of Summerhays Street on the south.
It is considered that the property abutting the above-described segments of street to be improved will be specially benefitted by this improvement and should be specially assessed.
Section 2. It is hereby found and determined that there are now on file in the office of the City Clerk an estimated total cost of the proposed work and a preliminary plat and schedule showing the amount proposed to be assessed to each lot by reason of the Project.
Section 3. This City Council will meet at seven o’clock p.m., on November 7, 2017, at the City Hall Council Chambers, in the City, at which time and place it will hear the property owners subject to the proposed assessment or assessments and interested parties for or against the Project, its cost, the assessment thereof or the boundaries of the properties to be assessed.
Sources
- laserfiche: Resolutions-2017-094 (Resolutions-2017-094.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.