resolution

Resolutions-2017-094

Dated October 17, 2017 26 pages Res. 2017-094, Res. 2017-093, Res. 2017-095

Open the PDF

Page 3 of 26

Text from the PDF text layer; check the PDF for anything that matters.
DocuSign Envelope ID: D82AD833- 90BE-4C86-B718-E81DA1F95216 Tiffin /436989-21 /RN RESOLUTION NO. 2017-093 Preliminary resolution pursuant toSection 384.42oftheIowa Code covering the 2017 Original Town Urbanization Project WHEREAS, itisdeemed advisable bytheCity Council oftheCity ofTiffin, Iowa (the Cityinaccordance with theprovisions ofChapter 384 oftheCode ofIowa, andaportion ofthe cost beassessed tothe property benefited thereby; and WHEREAS, theCity hasarranged forengineering services fortheProject with Hart- Frederick Consultants PC; NOW, THEREFORE, BeItResolved bytheCity Council oftheCity ofTiffin, Iowa, as follows: Section 1. The Project shallinclude pulverizing andgrading oftheexisting asphalt street; storm sewer installation; construction of5-foot wide sidewalks, 36-inch wide PCC curb andgutter, 5-inchthick hot mix asphalt street and PCC driveway approaches; installation of street lights; andundertaking associated incidental improvements. The Project shall beconstructed onandalong thefollowing segments ofstreets inthe City ofTiffin, Johnson County, Iowa: 1) College Street from itsintersection with West Third Street onthe north toapoint situated 180 feet north ofitsintersection with Railroad Street onthesouth; (2)Railroad Street from apoint situated 60feet east ofitsintersection with College Street onthewest to,and including, itsintersection with Main Street ontheeast; (3)Grant Street from itsintersection with West Second Street onthenorth to,andincluding, itsintersection with Railroad Street onthe south; (4)Main Street from itsintersection with West Second Street onthenorth to,and including, itsintersection with Railroad Street onthesouth; and (5)Summerhays Street from its intersection with West Second Street onthenorth tothetermination ofSummerhays Street on thesouth. Itisconsidered that the property abutting theabove-described segments ofstreet tobe improved willbespecially benefitted bythisimprovement andshould bespecially assessed. Section 2. The Project Engineers arehereby ordered toprepare preliminary plans and specifications, anestimated total cost ofthe work andaplat andschedule andtofilethe same with theCity Clerk. Section 3. subsequent proceedings. 3- DORSEY & WHITNEY LLP,ATTORNEYS, DESMOINES, IOWA

Sources

  • laserfiche: Resolutions-2017-094 (Resolutions-2017-094.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.