resolution
Resolutions-2017-094
Page 3 of 26
Text from the PDF text layer; check the PDF for anything that matters.DocuSign Envelope ID: D82AD833- 90BE-4C86-B718-E81DA1F95216
Tiffin /436989-21 /RN
RESOLUTION NO. 2017-093
Preliminary resolution pursuant toSection 384.42oftheIowa Code covering the
2017 Original Town Urbanization Project
WHEREAS, itisdeemed advisable bytheCity Council oftheCity ofTiffin, Iowa (the
Cityinaccordance with theprovisions ofChapter 384 oftheCode ofIowa, andaportion ofthe
cost beassessed tothe property benefited thereby; and
WHEREAS, theCity hasarranged forengineering services fortheProject with Hart-
Frederick Consultants PC;
NOW, THEREFORE, BeItResolved bytheCity Council oftheCity ofTiffin, Iowa, as
follows:
Section 1. The Project shallinclude pulverizing andgrading oftheexisting asphalt
street; storm sewer installation; construction of5-foot wide sidewalks, 36-inch wide PCC curb
andgutter, 5-inchthick hot mix asphalt street and PCC driveway approaches; installation of
street lights; andundertaking associated incidental improvements.
The Project shall beconstructed onandalong thefollowing segments ofstreets inthe
City ofTiffin, Johnson County, Iowa:
1) College Street from itsintersection with West Third Street onthe north toapoint
situated 180 feet north ofitsintersection with Railroad Street onthesouth; (2)Railroad Street
from apoint situated 60feet east ofitsintersection with College Street onthewest to,and
including, itsintersection with Main Street ontheeast; (3)Grant Street from itsintersection with
West Second Street onthenorth to,andincluding, itsintersection with Railroad Street onthe
south; (4)Main Street from itsintersection with West Second Street onthenorth to,and
including, itsintersection with Railroad Street onthesouth; and (5)Summerhays Street from its
intersection with West Second Street onthenorth tothetermination ofSummerhays Street on
thesouth.
Itisconsidered that the property abutting theabove-described segments ofstreet tobe
improved willbespecially benefitted bythisimprovement andshould bespecially assessed.
Section 2. The Project Engineers arehereby ordered toprepare preliminary plans and
specifications, anestimated total cost ofthe work andaplat andschedule andtofilethe same
with theCity Clerk.
Section 3.
subsequent proceedings.
3-
DORSEY & WHITNEY LLP,ATTORNEYS, DESMOINES, IOWA
Sources
- laserfiche: Resolutions-2017-094 (Resolutions-2017-094.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.