resolution
Resolutions-2017-068
Page 5 of 19
Text read by the vision model; check the PDF for anything that matters.B. Public Improvement Standards. All improvements and facilities described in this Agreement shall be constructed and installed by the Developer according to the plans, specifications, ordinances and standards of the City and in accordance with all applicable federal and state laws and regulations. All required inspections shall be performed by the City Engineer or designate. Said inspections shall consist of inspection of the work in progress but shall not relieve or release the Developer from its responsibility to construct said improvements and facilities pursuant to the agreed upon plans and specifications. These improvements and facilities include but are not limited to public water system; sanitary sewer system; storm sewer and drainageway system; site grading; underground utilities; setting for lot and block monuments; and surveying and staking.
C. Standard Requirements. Further, the Developer agrees that:
1. City and Developer acknowledge that all streets shown on the plat have been constructed and accepted by the City..
2. The Developer and City acknowledge the installation of all electric lines, street lights, gas mains, telephone lines and other utility facilities that are necessary for the Development.
3. At such time as building construction occurs on a lot, but in no event later than five (5) years from the date the subdivision plat is recorded, the Developer shall install sidewalks in said subdivision abutting said lots per the widths approved on the preliminary plat, in accordance with the plans and specifications of the City, and subject to inspections by the City Engineer or designate, unless otherwise shown on the plat or otherwise specified in this agreement.
4. The Developer and City acknowledge that all water mains and sanitary sewer mains have been previously installed and accepted by the City.
5. The Developer shall submit to the City, for approval by the City Engineer, a storm water management plan which will identify the drainage of this development and specify the manner in which storm water, drainage and runoff will be accommodated. The Developer agrees to dispose of all storm water through the approved storm water and drainageway system as set forth in the storm water management plan. The design and construction of the storm water detention basin, if required by the City for this development, shall be in compliance with the City’s current storm water management ordinances and policies.
6. As this subdivision is a resubdivision of Lots 8, 9, 10, 11, 12, 14, 15, 16, 17, 18, 20, 21, 22, 27, 28 and 29 Reeves Addition, Part Two, owners of condominium units in the proposed Condominium Regime shall be members of the Central Park Condominiums Owners Association and entitled to the benefits of membership. Developer acknowledges that the property shown on Exhibit “A” will be subject to a drainage easement. The Association shall have the responsibility of repairing and doing maintenance to the improvements located in easement area shown on Exhibit “A” and as specified in the easement agreement. The City
Sources
- laserfiche: Resolutions-2017-068 (Resolutions-2017-068.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.