resolution

Resolutions-2017-043

Dated October 3, 2017 18 pages Res. 2017-043, Res. 2017-041

Open the PDF

Page 9 of 18

Text read by the vision model; check the PDF for anything that matters.
City. C. In the event the Developer, its assigns or successors in interest, should sell or convey lots in said subdivision without having constructed the public improvements and facilities as provided in this Agreement or without the City having accepted all public improvements and facilities; or the Developer, its assigns or successors in interest in said subdivision, shall fail to construct sidewalks as set forth in Section 3(C)(4), the City shall have the right to install and construct said improvements, facilities and sidewalks. Unless City is fully reimbursed for these costs from the escrowed money or surety bond held by the City, the costs of said public improvements, facilities and sidewalks shall be a lien and charge against all of the lots adjacent to or in front of the improvements, facilities and sidewalks that are constructed and any lots which may be assessed for public improvements, facilities and sidewalks under the provisions of Chapters 364 and 384 of the Iowa Code. It is further provided that this requirement to construct said public improvements, facilities and sidewalks is and shall remain a lien from the date of execution until properly released as hereinafter provided. D. The Developer acknowledges and agrees that all lots of the subdivision are specifically benefited by the public improvements, facilities and sidewalks, and the cost of such public improvements, facilities and sidewalks need not meet the requirements of notice, benefit or value as provided by the law of the State of Iowa for assessing such improvements and facilities. SECTION 9. ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION A. The Developer shall submit to the City, for approval by the City Engineer, plans and specifications for the construction of improvements in the subdivision which have been prepared by a registered professional civil engineer. The Developer shall obtain approval of the construction plans and all necessary permits from the appropriate city, state and federal agencies before proceeding with construction. In addition, the Developer shall cause to have its engineer provide adequate field inspection personnel to ensure that an acceptable level of quality control is maintained. B. The Developer shall pay all reasonable costs of City engineering administration, which will include review of the Developer's final construction plans and specifications, monitoring of construction, and consultation with the Developer and its engineer on the status, progress or other issues regarding the project. The Developer shall pay for the reasonable construction observation performed by the City staff or consulting City Engineer. Construction observation will consist of examination of proposed public utilities, street construction and other infrastructure improvements. The engineering administrative fee and construction observation fees to be paid by the Developer shall be determined by the City, in part based on the standard hourly fee schedule in effect between the City Engineer and the City on file at City Hall and in part based on standard fees for other staff members that perform the duties noted above. The City shall provide the appropriate supporting documentation for these fees upon request by the Developer. SECTION 10. RELEASE The City agrees that when the public improvements, facilities and sidewalks required by Section 3 of this Agreement have been installed in accordance with the terms of this Agreement,

Sources

  • laserfiche: Resolutions-2017-043 (Resolutions-2017-043.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.