contract agreement · K-3

Discussion and Consideration of Pay Application #9 – Miron Construction – Tiffin Recreation Center – Motion to Approve — K-3

Dated February 17, 2026City Council — regular meeting, February 17, 2026 80 pages

Open the PDF Searchable (OCR) PDF

Page 32 of 80

Text from the PDF text layer; check the PDF for anything that matters.
architectural, engineering or surveying 3. the “property damage” coverage of the services, including: policy would extend to the operation causing the loss. (1) The preparing, approving, or failing to b. The insurance under this coverage does not prepare or approve, maps, shop apply to “voluntary property damage” to drawings, opinions, reports, surveys, property: field orders, change orders or drawings, designs and specifications; and 1. while being transported by, or caused by the (2) Supervisory, inspection, architectural or ownership, maintenance, operation, use, engineering activities. loading or unloading of any automobile, watercraft or aircraft; or XIV. Bodily Injury Redefined 2. rented to any Named Insured. The definition of “bodily injury” in Section V - Definitions is deleted and replaced by the c. This insurance will apply only to loss that is in following: excess of $250 for each “occurrence.” 3. “Bodily injury” means bodily injury, sickness or d. The most we will pay under this coverage is disease sustained by a person including $5,000 for each “occurrence” subject to $5,000 mental anguish or death resulting from any of aggregate for the policy year. these. The each “occurrence” and aggregate limit is XV. Mobile Equipment Redefined in addition to the each “occurrence” and Paragraph 12.f. subparagraph (1) of Section V - aggregate limit of the Voluntary Property Definitions does not apply to self-propelled vehicles Damage limit provided in the Contractors of less than 1000 pounds gross vehicle weight. Special Liability endorsement 70 1909 if attached to this policy. XVI. Unintentional Errors or Omissions We will not deny coverage under this Coverage e. Payment under this coverage will not include Part because of the unintentional omission of, or any prospective profit or overhead charges of unintentional error in, any information provided by any nature. you. However, this provision does not affect our right to collect additional premium or exercise our f. “Voluntary property damage” as used in this right of cancellation or non-renewal. coverage means physical injury to tangible property and does not include disappearance, XVII.Liberalization abstraction or loss of use. If we adopt any revision that would broaden the coverage under this policy without additional XIX. Special Broad Form Property Damage premium within 45 days prior to or during the policy Liability Coverage period, the broadened coverage will immediately apply to this policy. a. Section I. Coverage A., 2. Exclusion, j. Damage To Property, Paragraphs j.(3), j.(4), and j.(5) are XVIII.Voluntary Property Damage modified as follows: a. We will pay, at the request of any Named Insured, for “voluntary property damage” to the Exclusions j.(3), j.(4) and j.(5) do not property of others provided: apply to the first $5,000 of “property damage” for each “occurrence” that would otherwise be 1. the “voluntary property damage” occurs insured except for the application of these while such property is in the care, custody or exclusions, as long as the “occurrence” takes control of an insured or to property over place away from the premises you own, rent or which an insured is, for any purpose, control. exercising physical control; 2. the “voluntary property damage” arises out The limit above is in addition to the limit for of operations away from the premises Special Broad Form Property Damage Liability owned by, rented to, or controlled by the Coverage 70 1909 if attached to this policy. Named Insured; and 71 1403 0121 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 10 of 11 Copyright Insurance Services Office, Inc., 1984, 1992, 2003, 2004, 2006, 2012, 2013

Sources

Attached to agenda item: K-3 Discussion and Consideration of Pay Application #9 – Miron Construction – Tiffin...

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.