contract agreement · K-3
Discussion and Consideration of Pay Application #9 – Miron Construction – Tiffin Recreation Center – Motion to Approve — K-3
Page 32 of 80
Text from the PDF text layer; check the PDF for anything that matters. architectural, engineering or surveying 3. the “property damage” coverage of the
services, including: policy would extend to the operation causing
the loss.
(1) The preparing, approving, or failing to b. The insurance under this coverage does not
prepare or approve, maps, shop apply to “voluntary property damage” to
drawings, opinions, reports, surveys,
property:
field orders, change orders or drawings,
designs and specifications; and
1. while being transported by, or caused by the
(2) Supervisory, inspection, architectural or ownership, maintenance, operation, use,
engineering activities. loading or unloading of any automobile,
watercraft or aircraft; or
XIV. Bodily Injury Redefined 2. rented to any Named Insured.
The definition of “bodily injury” in Section V -
Definitions is deleted and replaced by the c. This insurance will apply only to loss that is in
following: excess of $250 for each “occurrence.”
3. “Bodily injury” means bodily injury, sickness or d. The most we will pay under this coverage is
disease sustained by a person including $5,000 for each “occurrence” subject to $5,000
mental anguish or death resulting from any of aggregate for the policy year.
these.
The each “occurrence” and aggregate limit is
XV. Mobile Equipment Redefined in addition to the each “occurrence” and
Paragraph 12.f. subparagraph (1) of Section V - aggregate limit of the Voluntary Property
Definitions does not apply to self-propelled vehicles Damage limit provided in the Contractors
of less than 1000 pounds gross vehicle weight. Special Liability endorsement 70 1909 if
attached to this policy.
XVI. Unintentional Errors or Omissions
We will not deny coverage under this Coverage e. Payment under this coverage will not include
Part because of the unintentional omission of, or any prospective profit or overhead charges of
unintentional error in, any information provided by any nature.
you. However, this provision does not affect our
right to collect additional premium or exercise our f. “Voluntary property damage” as used in this
right of cancellation or non-renewal. coverage means physical injury to tangible
property and does not include disappearance,
XVII.Liberalization abstraction or loss of use.
If we adopt any revision that would broaden the
coverage under this policy without additional XIX. Special Broad Form Property Damage
premium within 45 days prior to or during the policy Liability Coverage
period, the broadened coverage will immediately
apply to this policy. a. Section I. Coverage A., 2. Exclusion, j. Damage
To Property, Paragraphs j.(3), j.(4), and j.(5) are
XVIII.Voluntary Property Damage modified as follows:
a. We will pay, at the request of any Named
Insured, for “voluntary property damage” to the Exclusions j.(3), j.(4) and j.(5) do not
property of others provided: apply to the first $5,000 of “property damage” for
each “occurrence” that would otherwise be
1. the “voluntary property damage” occurs insured except for the application of these
while such property is in the care, custody or exclusions, as long as the “occurrence” takes
control of an insured or to property over place away from the premises you own, rent or
which an insured is, for any purpose, control.
exercising physical control;
2. the “voluntary property damage” arises out The limit above is in addition to the limit for
of operations away from the premises Special Broad Form Property Damage Liability
owned by, rented to, or controlled by the Coverage 70 1909 if attached to this policy.
Named Insured; and
71 1403 0121 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 10 of 11
Copyright Insurance Services Office, Inc., 1984, 1992, 2003, 2004, 2006, 2012, 2013
Sources
- revize: K-3 (idkO7CGapkWzUtRwvHU907cOCEXEc7.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-3 Discussion and Consideration of Pay Application #9 – Miron Construction – Tiffin...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.