contract agreement · K-3
Discussion and Consideration of Pay Application #9 – Miron Construction – Tiffin Recreation Center – Motion to Approve — K-3
Page 15 of 80
Text from the PDF text layer; check the PDF for anything that matters. insured(s) at the location of the covered
operations has been completed; or
b. That portion of “your work” out of which
the injury or damage arises has been put
to its intended use by any person or
organization other than another contractor
or subcontractor engaged in performing
operations for a principal as part of the
same project.
C. The limits of insurance applicable to the
additional insured are those specified in the
written contract or agreement or in the
Declarations for this policy, whichever are less.
These limits of insurance are inclusive of and not
in addition to the limits of insurance shown in the
Declarations.
D. With respect to the coverage provided by this
endorsement, SECTION IV – COMMERCIAL
GENERAL LIABILITY CONDITIONS, Paragraph
4. Other Insurance, Subparagraph a. Primary
Insurance, is replaced by the following:
a. Primary Insurance
This insurance is primary except when
Paragraph b. below applies. If this insurance
is primary, our obligations are not affected
unless any of the other insurance is also
primary. Then, we will share with all that other
insurance by the method described in
Paragraph c. below, except;
(1) If a written contract or agreement that
requires any person(s) or organization(s)
to be an additional insured also requires
this insurance to be primary and
noncontributory, then this insurance is
primary over any other insurance in which
the additional insured is a Named Insured.
We will not seek contribution from any
other liability policy in which the additional
insured is a Named Insured.
71 0741 0121 Page 2 of 2
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Copyright, © 2006, 2007, 2012 by ISO Properties, Inc., and ISO Services Properties, Inc.,
ALL RIGHTS RESERVED.
Sources
- revize: K-3 (idkO7CGapkWzUtRwvHU907cOCEXEc7.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-3 Discussion and Consideration of Pay Application #9 – Miron Construction – Tiffin...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.