resolution

Resolutions-2016-076 (4)

2016 10 pages Res. 2016-076

Open the PDF

Page 3 of 10

Text from the PDF text layer; check the PDF for anything that matters.
DocuSign Envelope ID: 5133273A- F756- 4E4D- 9ACA- 5A9FFAB9B7B5 C. Standard Requirements. Further, the Developer agrees that: 1. All streets shown on the plat will be constructed of concrete paving with concrete curb and gutter, which will be shown on the construction plans, to be approved by the City Engineer, and will be dedicated to the City. 2. The Developer shall provide for the installation of all electric lines, street lights, gas mains, telephone lines and other utility facilities that are necessary at the Developer' s sole cost. Developer further agrees that all utilities shall be installed underground. 3. Any decorative street lighting shall be approved by the City and installed at the Developer' s sole cost. 4. At such time as building construction occurs on a lot, but in no event later than five ( 5) years from the date the subdivision plat is recorded, the Developer shall install sidewalks in said subdivision abutting said lots per the widths approved on the preliminary plat, in accordance with the plans and specifications of the City, and subject to inspections by the City Engineer or designate, unless otherwise shown on the plat or otherwise specified in this agreement. The Developer is responsible to install and pay for the City portion of the sidewalks along Outlot A and Outlot C. 5. The Developer shall submit to the City, for approval by the City Engineer, a storm water management plan which will identify the drainage of this development and specify the manner in which storm water, drainage and runoff will be accommodated. The Developer agrees to dispose of all storm water through the approved storm water and drainageway system as set forth in the storm water management plan. The design and construction of the storm water detention basin, if required by the City for this development, shall be in compliance with the City' s current storm water management ordinances and policies. 6. The Developer shall provide water, sewer, utility and drainage easements as shown on the approved final plat. 7. Any wells shall be abandoned in accordance with applicable local, state and federal laws and regulations. 8. The Developer has met the requirements laid out in Section 4. 08 of the Tiffin Subdivision Ordinance regarding Neighborhood Open Space Requirements through dedication of property to the City pursuant to the open space requirements of the Subdivision Ordinance in effect when previous phases of Woodfield Ridge were approved. 3

Sources

  • laserfiche: Resolutions-2016-076 (4) (Resolutions-2016-076 (4).pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.