packet
Packet: Tiffin City Council Regular Meeting (03/03/2026)
Dated March 3, 2026City Council — regular meeting, March 3, 2026 133 pages
Ord. 2026-524, Ord. 2026-523, Ord. 2025-520, Res. 2026-014, Res. 2026-015, Res. 2026-016, Res. 2026-010, Res. 2026-011, Res. 2026-008, Res. 2026-009, Res. 2026-012, Res. 2026-013
Page 89 of 133
Text read by OCR; check the PDF for anything that matters.Progress Estimate - Lump Sum Work Contractor's Application for Payment
Owner: City of Tiffin Owner's Project No.:
Engineer: | MSA Professional Services Engineer's Project No.: 13603016
Contractor: Tricon Construction Group Contractor's Project No.:
Project: Water Treatment Plant Upgrades - City of Tiffin
Contract:
Application No.: 6R Application Period: From 01/24/26 to 02/20/26 Application Date: 02/20/26
87 Metal Roofing - Materials $35,256.00 - 35,256.00
88 Metal Roofing - Labor $40,587.00 - 40,587.00
89 Preformed Metal Soffit - Materials $5,877.00 - 5,877.00
90 Preformed Metal Soffit - Labor $9,992.12 - 9,992.12
91 Gutters & Downspouts - Materials $5,600.00 - 5,600.00
92 Gutters & Downspouts - Labor $8,544.32 - 8,544.32
93 Structure 30 - Clearwell - -
94 Metal Roofing - Materials $9 442.00 - 9,442.00
95 Metal Roofing - Labor $11,566.68 - 11,566.68
96 Preformed Metal Soffit - Materials $3,655.00 - 3,655.00
97 Preformed Metal Soffit - Labor $6,552.46 - 6,552.46
98 Gutters & Downspouts - Materials $2,651.00 - 2,651.00
99 Gutters & Downspouts - Labor $3,215.42 - 3,215.42
100 Roof Hatches - Materials $6,200.00 - 6,200.00
101 - .
102 Openings - -
103 HM Frames, Doors & Hardware-Materials $53,528.00 - 53,528.00
104 HM Frames, Doors & Hardware-Labor $6,890.00 - 6,890.00
105 Vault Doors - Materials $49,611.00 21,050.00 21,050.00 28,561.00
106 Vault Doors - Labor $3,110.00 - 3,110.00
107 Overhead Door $43,790.00 - 43,790.00
108 Aluminum Windows $8,996.00 - 8,996.00
109 = =
110 Finishes - -
111 Resilient Base $2,500.00 - 2,500.00
112 _|Epoxy Flooring $67,408.00 - 67,408.00
113 High Performance Coatings $68,724.00 13,314.75 13,314.75 55,409.25
114 - -
115 Specialties = 2
116 Signage $450.00 - 450.00
117 Metal Lockers $7,100.00 - 7,100.00
EJCDC® C-620 Contractor's Application for Payment
© National Society of Professional Engineers for EJCDC. All rights reserved.
00 62 76 - 4 of 10 \FILESERVER\Shares\Projects\Active\Tiffin WTP (25-012-IA)\3-Tricon\PaymentApplications\Pay Application
Sources
- revize: Agenda packet (packet_2026-03-03_69b80a70-7c35-4dc3-b01e-966369bd0f18.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 18, 2026. Built from the archive's documents; see how the data is built.