Page 87 of 133

Text read by OCR; check the PDF for anything that matters.
Progress Estimate - Lump Sum Work Contractor's Application for Payment Owner: City of Tiffin Owner's Project No.: Engineer: MSA Professional Services Engineer's Project No.: 13603016 Contractor: Tricon Construction Group Contractor's Project No.: Project: Water Treatment Plant Upgrades- City of Tiffin Contract: Application No.: 6R Application Period: From 01/24/26 to 02/20/26 Application Date: 02/20/26 25 Rebar - Labor $71,872.60 21,561.78 35,936.30 57,498.08 80% 14,374.52 26 Base Footings Materials $89,665.00 89,665.00 89,665.00 100% - 27 Base Footings Labor $49,315.75 49,315.75 49,315.75 100% - 28 Wall Footings Materials $98,663.00 2 98,663.00 98,663.00 100% - 29 Wall Footings Labor $54,264.65 - 54,264.65 54,264.65 100% - 30 Floor Slab Materials $156,442.00 - - 0% 156,442.00 31 Floor Slab Labor $88,874.50 - - 0% 88,874.50 32 Equipment Pads Materials $1,515.00 - - 0% 1,515.00 33 Equipment Pads Labor $3 451.50 - - 0% 3,451.50 34 Precast Concrete Materials $575,000.00 - 12,125.00 12,125.00 2% 562,875.00 35 Precast Concrete Labor $204,412.67 - - 0% 204,412.67 36 Structure 30- Clearwell - - - 37 Rebar Materials $204,551.00 - - 0% 204,551.00 38 Rebar labor $112,503.05 - - 0% 112,503.05 39 Mat Foundation - Materials $123,255.00 - - 0% 123,255.00 40 Mat Foundation - Labor $68,450.80 - - 0% 68,450.80 Al Walls - Materials $78,452.00 - - 0% 78,452.00 42 Walls - Labor $98,065.00 - - 0% 98,065.00 43 Elevated Slab - Materials $198,553.00 - - 0% 198,553.00 44 Elevated Slab - Labor $109,204.15 = - 0% 109,204.15 45 Precast Concrete - Materials $210,000.00 - - 0% 210,000.00 46 Precast Concrete - Labor $61,058.33 - - 0% 61,058.33 47 - - - 48 Masonry - < g 49 Masonry- Materials $15,116.00 - - 0% 15,116.00 50 Masonry - Labor $50,603.00 - - 0% 50,603.00 51 - - - 52 Metals - - - 53 Metal Fabrications - Materials $57,200.00 - - 0% 57,200.00 54 Metal Fabrications - Labor $13,556.25 - - 0% 13,556.25 55 Handrails & Railings Labor $5,966.50 - - 0% 5,966.50 EJCDC® C-620 Contractor's Application for Payment © National Society of Professional Engineers for EJCDC. All rights reserved. 00 62 76 - 2 of 10 \\FILESERVER\Shares\Projects\Active\Tiffin WTP (25-012-IA)\3-Tricon\PaymentApplications\Pay Application

Sources

  • revize: Agenda packet (packet_2026-03-03_69b80a70-7c35-4dc3-b01e-966369bd0f18.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 18, 2026. Built from the archive's documents; see how the data is built.