Text from the PDF text layer; check the PDF for anything that matters. 41. Evaluate and reconsider pipe slop and connection elevations between structure
B-1 and F-B-2 to reduce 42.5 fps velocity to below 15 fps.
Pipe slope has been decreased as much as feasible without increasing
structure depth such that the structure would need to be increased in size
and cost.
42. Consider removing TC and GUTTER elevations for proposed outlet structures 1-
D-1 and F-B-1.
Elevations have been removed.
43. Assuming outlet structures 1-D-1 and F-B-1 are existing, update the structures
from PROP to EXISTING.
Labels have been corrected.
44. It appears that the roof drain line (8” pipe) encroaches on the public right of way
east of Building 14. Revise.
Pipe has been shifted.
Sheet L100
45. Add note to plans if it is determined that the canopy for trees impede fire lane
access, the fire department will provide owner or responsible party to trim trees
along the fire lane access. They will have 5 business days to trim or maintain the
trees.
Note has been added.
Fire Submittals and Inspections
This is not a complete list, please contact Fire Marshal for assistance.
46. Fire line thrust block shall be inspected by the Fire Marshal prior to burial.
See notes sheet C500.
47. NFPA 24 Underground high velocity flush shall be conducted prior to the
sprinkler contractor connecting to the fire line.
See notes sheet C500.
48. Fire Sprinkler System, (need a flow test within 90-day submittal of fire sprinkler
plans.)
See notes sheet C500.
49. Permits for fire alarm and fire suppression system.
See notes sheet C500.
50. Verify dead end on the west side of building 11 meets fire access requirements.
It appears that this dead end is greater than 150 feet long and would require
some sort of turnaround.
An exhibit has been provided using 150’ hose lay length and 150’ maximum
dead end.
Sources
- revize: Marvin Gardens Engineering Notes (PNM6FssBh2IKQdAp1MMRgESmC0uvPa.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E Discussion and Consideration of OPD Site District, Park Place City Center – Part One,...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.