bid award · K-10

Discussion and Consideration of Tiffin Public Restrooms Bid at Deerview Park and Council Action as Needed — K.10

Open the PDF Searchable (OCR) PDF

Page 7 of 13

Text read by the vision model; check the PDF for anything that matters.
STANDING SEAM METAL ROOF 4' 12" 3" YTR W/BOOT VERTICAL METAL SIDING 12 4" METAL FACIA AND SOFFIT 1' 6" 1/2 INCH EXPANSION JOINT (ALL SIDES) 1.5% MAX. FALL 4' 0" 4 INCH SIDE WALK 4' 0" 4 INCH CONCRETE FLOOR TRENCH FOOTING TOP OF PLATE WALL PACK LED LIGHT FIXTURE 8"X16" CMU SPLIT FACE BLOCK 1.5% MAX. FALL 4 TOP OF FLOOR 4 INCH SIDE WALK BOTTOM OF TRENCH FOOTING 4' 0" 3' 6" 8' 0" FRONT ELEVATION SCALE: 1/8" = 1'-0"

Sources

Attached to agenda item: K-10 Discussion and Consideration of Tiffin Public Restrooms Bid at Deerview Park and...

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.