Text read by the vision model; check the PDF for anything that matters.STANDING SEAM METAL ROOF
4' 12"
3" YTR W/BOOT
VERTICAL METAL SIDING
12 4"
METAL FACIA AND SOFFIT
1' 6"
1/2 INCH EXPANSION JOINT (ALL SIDES)
1.5% MAX. FALL
4' 0"
4 INCH SIDE WALK
4' 0"
4 INCH CONCRETE FLOOR
TRENCH FOOTING
TOP OF PLATE
WALL PACK LED LIGHT FIXTURE
8"X16" CMU SPLIT FACE BLOCK
1.5% MAX. FALL
4 TOP OF FLOOR
4 INCH SIDE WALK
BOTTOM OF TRENCH FOOTING
4' 0"
3' 6"
8' 0"
FRONT ELEVATION
SCALE: 1/8" = 1'-0"