Owner Responsibilities: -City of Tiffin shall perform all final water and sanitary sewer tie-ins. Exclusions: -Surface restoration (pavement, turf, landscaping, sidewalk, curb, or hardscape) -Utility tie-ins (water, sewer, electric) -Traffic control and flagging -Permits, permit fees, bonding, and special inspections -Private utility locates -Environmental testing or remediation -Unforeseen or concealed subsurface conditions, including undocumented utilities, obstructions, or unsuitable materials -Additional excavation beyond entry and exit pits required for boring operations -Issues related to owner- or customer- supplied materials Assumptions: -Typical soil conditions suitable for directional boring. -Clear and accessible bore paths with no major conflicts. -Work performed during normal working hours. -Materials furnished by others are provided in acceptable condition and in a timely manner. Schedule: -Anticipated duration of directional boring operations is approximately 1 to 3 working days, weather and site conditions permitting. Total $16,100.00 Accepted date Accepted by to k e n = 1 1 f1 b 7 c a c 6 d 1 4 8 9 7 a e 8 e 2 f5 9 5 f8 0 3 a 4 7 e 2 4 1 7 b 2 3 7 b 2 5 4 a 1 fa 0 6 3 f2 1 e 2 4 3 d c 4 9 5 7 d 3 b a 0 2 0 f4 1 1 4 3 4 b b 1 9 b 2 b 0 5 e 6 1 1 d 3 3 5

Sources

Attached to agenda item: K-10 Discussion and Consideration of Tiffin Public Restrooms Bid at Deerview Park and...

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.