Discussion and Consideration of Change Order #14 – Boomerang Corporation – North Park Road Improvements Project – Motion to Approve — K.2

Open the PDF

Page 7 of 18

Text from the PDF text layer; check the PDF for anything that matters.
8190: Agreed unit price. Unit Price ($6,250.00/EA) is above the average unit bid price of the same item ($4,478.87/EA) and above the maximum unit bid price ($5,250.00/LF) when compared with the Summary of Awarded Contract Unit Prices for the item from February 2025 to January 2026. Unit price includes Prime Contractor markup of 10% per 1109.03,3. 8200: Agreed unit price. Unit Price ($1,796.85/EA) is below the unit bid price of the same item ($2,700.00/EA) when compared to a Cedar Rapids project (STBG- SWAP-1187(824)--SG-57) bid in December of 2022. This appears to be the most recent project to use item 2435-0250902 INTAKE, SW-509, WELL ONLY. It should be noted that item 8200 is for the material price of the well section of an SW-509 intake only. No transportation, labor, equipment, or other incidental costs are included in this unit price. Boomerang has provided invoices for review. Unit price does include Prime Contractor markup of 10% per 1109.03,3. 8210: Agreed unit price. This price for a MANHOLE, STORM SEWER, SW-401, 60 IN., WELL ONLY ($2,117.50/EA) was compared to a smaller-sized item from a Cedar Rapids project (STBG-SWAP-1187(824)--SG-57) bid in December of 2022. This project included a MANHOLE, STORM SWR, SW-401, 48" (WELL ONLY) with a bid price of $3,000.00/EA. The proposed unit price ($2,117.50/EA) is below the unit bid price of the smaller sized item ($3,000/00/EA). It should be noted that item 8210 is for the material price of the well section of an SW-401, 60 IN. manhole only. No transportation, labor, equipment, or other incidental costs are included in this unit price. Boomerang has provided invoices for review. Unit price does include Prime Contractor markup of 10% per 1109.03,3. E-contract time adjustment These changes would add 14 days to the controlling item of work. See below a list of the items with work time adjustments and their associated working day changes provided by Boomerang. 0110 STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 9 IN. - Quantity increase of 126.5 SY, 1.5 days extra work 0340 MANHOLE, STORM SEWER, SW-403 MODIFIED - Removed from project, remove 1.2 days work 0420 INTAKE ADJUSTMENT, MINOR - Increase by 1 EA, 0.2 days extra work 0480 STORM SEWER GRAVITY MAIN, TRENCHED, REINFORCED CONCRETE PIPE (RCP), 2000D (CLASS III), 21 IN - 57LF removed from project, remove 0.6 days work 0490 STORM SEWER GRAVITY MAIN, TRENCHED, REINFORCED CONCRETE PIPE (RCP), 2000D (CLASS III), 24 IN. - 58LF added to project, 0.6 days extra work 0640 RECREATIONAL TRAIL, PORTLAND CEMENT CONCRETE, 6 IN - 374.5SY removed from project, remove 0.25 days work 0670 SIDEWALK, P.C. CONCRETE, 6 IN. - 23.8SY added to project, add 0.25 days work Change Order Details: 03/30/2026 52-7662-615 Page 6 of 16

Sources

Attached to agenda item: K-2 Discussion and Consideration of Change Order #14 – Boomerang Corporation – North Park...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.