ordinance

Ordinances-2018-437

Dated June 20, 2018 5 pages Ord. 2018-437, Ord. 437

Open the PDF

Page 2 of 5

Text read by the vision model; check the PDF for anything that matters.
necessary whether or not utility facilities must be relocated, the City at its own cost shall be responsible for said removals. If the timing of the tree/vegetation removal does not coincide with the Company facilities relocation schedule and Company must remove trees/vegetation that are included in the City’s portion of the project, the City shall either remove the material at its cost or reimburse the Company for the expenses incurred to remove said vegetation or trees. If project funds from a source other than the City are available to pay for the relocation of utility facilities, the City shall attempt to secure said funds and provide them to the Company to compensate the Company for the costs of relocation. Section 5. In making excavations in any streets, avenues, alleys and public places for the installation of gas pipes, conduits or apparatus, Company shall not unreasonably obstruct the use of the streets and shall replace the surface, restoring it to the condition as existed immediately prior to excavation. Company agrees any replacement of road surface shall conform to current City code regarding its depth and composition. The Company shall not be required to restore or modify public right of way, sidewalks or other areas in or adjacent to the Company project to a condition superior to its immediate previously existing condition or to a condition exceeding its previously existing condition to the extent any alterations are required for the City to comply with city, state or federal rules, regulations or laws, but shall comply with applicable City ordinances and design standards in its restoration activities. Section 6. The City’s vacating a street, avenue, alley, public ground or public right-of-way shall not deprive the Company of its right to operate and maintain existing facilities on, below, above, or beneath the vacated property. Prior to the City abandoning or vacating any street, avenue, alley or public ground where the Company has facilities in the vicinity, the City shall provide Company with not less than sixty (60) days advance notice of the city’s proposed action and, upon request grant the Company a utility easement covering existing and future facilities and activities. Section 7. The Company shall not be required to relocate, at its cost and expense, Company facilities in the public right of way that have been relocated at Company expense at the direction of the City at any time during the previous five (5) years. Section 8. Pursuant to relocation of Company facilities as may be required here under, if the City orders or requests the Company to relocate its existing facilities or equipment in order to directly or indirectly facilitate the project of a commercial or private developer or other non-public entity, City shall reimburse or the City shall require the developer or non-public entity to reimburse the Company for the cost of such relocation as a precondition to relocation. The Company shall not be required to relocate in order to facilitate such private project at its expense. Section 9. The Company shall indemnify and save harmless the City from any and all claims, suits, losses, damages, costs or expenses, on account of injury or damage to any person or property, to the extent caused or occasioned by the Company’s negligence in construction, reconstruction, excavation, operation or maintenance of

Sources

  • laserfiche: Ordinances-2018-437 (Ordinances-2018-437.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.