engineering report · E
Discussion and Consideration of OPD Site District, Park Place City Center – Part One, Phase Seven, Lots 9-14 – Marvin Gardens — Marvin Gardens Engineering Notes
Page 1 of 8
Text from the PDF text layer; check the PDF for anything that matters.October 9, 2026
City of Tiffin
Doug Boldt, City Administrator
300 Railroad Street
P.O. Box 259
Tiffin, IA 52340
Re: Park Place City Center, Part One, Phase Seven, Lots 9-14 – Marvin Gardens
Dear Mr. Boldt:
We are in receipt of the MSA Professional Services letter with the subject “Park Place
City Center, Part One, Phase Seven, Lots 9-14.” We offer the following in response to city
staff comments and concerns.
General Comments
General
1. Once finalized, provide signed/sealed plan set.
Signed/sealed plans have been provided.
2. Provide snow storage location on plans.
a. We have concerns with snow being piled on the west/southwest sides of
the site and melting over the trail. If snow storage is planned in these
areas, identify how this will be mitigated.
Snow storage location has been labeled on plans. It is not proposed along the
west/southwest portion of the site.
3. It appears the intention is for these to remain individual lots. If that is the
intention, provide private access easements between the properties.
Access and utility easements will be blanket easements. Language to be
provided by Attorney.
4. Provide phasing plan.
Phasing limits have been added to the plans. The intention is for main shared
drives to be constructed in Phase 1.
5. Provide District Narrative.
District Narrative has been provided.
6. Provide architectural plans. These do not need to be signed final plans, but want
to verify building layout as there is conflicting information between the
rendering and the layouts provided.
Plans are in the process of being completed. They will be provided when
available.
Sources
- revize: Marvin Gardens Engineering Notes (PNM6FssBh2IKQdAp1MMRgESmC0uvPa.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E Discussion and Consideration of OPD Site District, Park Place City Center – Part One,...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.