ordinance

Ordinances-2003-260

Dated February 19, 2003 64 pages Ord. 2003-260, Ord. 260

Open the PDF

Page 37 of 64

Text read by the vision model; check the PDF for anything that matters.
insurance. (a) Bodily injury liability and (2) property damage liability. There shall be no restrictions on occurrence limits. All such insurance shall include an endorsement whereby the insurer agrees to notify the City of Tiffin at least 30 days prior to nonrenewal, reduction, or cancellation. The owner/developer shall cease, or cause to be ceased, operation, work, and construction of an improvement if the insurance is cancelled or reduced below the required minimum amount of coverage as determined by the City of Tiffin. Prior to the issuance of an access permit by the City of Tiffin, the owner/developer shall furnish to the City of Tiffin Certificates of insurances covering Workmen's Compensation, or satisfactory evidence that this liability is otherwise taken care of in accordance with Section 4. (a) Of the "Workmen's Compensation Act of the State of Iowa". Such insurance, or other means of protection as herein provided, shall be kept in force until all work to be performed under the terms of the access permit has been completed and accepted in accordance with this policy and it is hereby understood and agreed that the maintenance of such insurance or other protection, until acceptance of the work by the City of Tiffin is a part of the access permit. Failure to maintain such insurance, cancellation by the Industrial Commission of its approval of such other means of protection as might have been elected, or any other act which results in lack of protection under the said "Workmen's Compensation Act" may result in the revocation of the access permit. 7. Inspection The construction or reconstruction of an access driveway and any associated improvements of the City of Tiffin shall be inspected by a representative of the City of Tiffin. The number of inspections shall be determined by the City of Tiffin and reflect the complexity and magnitude of the access and improvements made to the City of Tiffin. 8. Enforcement If the developer fails to perform the work with sufficient work force and equipment or with sufficient materials to insure the completion of said within the specified time, or performs the work unsuitably as determined by the City of Tiffin, or neglects or refuses materials or performs anew such work as shall be rejected as defective and unsuitable, or discontinues the execution of the work, or for any other cause whatsoever does not carry on the work in an approved manner, the City of Tiffin shall give notice by registered mail to the developer and his/her Surety of such delinquency, said notice to specify the corrective measures required. After said notice, the City shall call upon the Performance Guarantee to have the work completed in accordance with

Sources

  • laserfiche: Ordinances-2003-260 (Ordinances-2003-260.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.