Page 26 of 64
Text read by the vision model; check the PDF for anything that matters.ii. The name, address, and telephone number of the developer/owner(s).
iii. The name of the property or development
iv. The location of the property in relation to municipal and township boundaries and all adjacent roads. A location map with an appropriate scale shall be used to indicate the location of the property with respect to the region.
v. The boundaries and parcel number(s) of the property in addition to the proposed layout of roads, lots, and blocks.
vi. A description of the current and proposed land uses and the existing and proposed zoning.
vii. The existing use of the abutting properties. All existing roads and access driveways within 1000 feet of the property.
viii. The identification of any legal right-of-ways or easements affecting the property as it relates to the prescribed roadway.
ix. The number, location, and dimensions of proposed access driveways.
x. The existing prescribed roadway right-of-way width and proposed right-of-way acquisitions, if appropriate.
xi. The existing and proposed dimensions of the prescribed roadway including through and turning lanes, shoulders, curbs, medians, etc.
xii. Proposed culvert or sewer grades with sufficient elevations upstream and downstream to show the extent of flow across the proposed development and to the proposed outlet. All City of Tiffin Storm Water Standards apply.
xiii. All site characteristics such as existing structures, utilities, natural drainage, floodplains, and wetlands within 1000 feet of the prescribed roadway.
xiv. Existing and proposed topography and contours at not greater then two foot intervals with 1000 feet of the prescribed roadway.
Sources
- laserfiche: Ordinances-2003-260 (Ordinances-2003-260.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.