ordinance

Ordinances-1995-197

Open the PDF

Page 15 of 40

Text read by the vision model; check the PDF for anything that matters.
C) If acceptable to the City, dedicated to the City as public open space for recreation or flood control purposes. 4.04 Plaf to Conform to Community Development Plan: The arrangement, character, extent, width, grade and location of all streets shall conform to the technical specifications for such streets as approved by the City Council. The general nature and extent of the lots and uses proposed shall conform to the Community Development Plan of the City, provided such plan has been adopted by the City; and shall conform to such other plans, including but not limited to a Major Street Plan, a Sanitary Sewer System Plan, or a Parks and Open Space Plan, provided such plan has been adopted by the City. 4.05 Construction Standards for Improvements: In addition to the Standards set forth in this ordinance the City Engineer shall from time to time prepare, and the Governing Body shall from time to time adopt by resolution, technical standards for public improvements. Such technical standards for public improvements shall contain the minimum acceptable specifications for the construction of public improvements. Such technical standards may vary for classes of improvements, giving due regard to the classification of streets or other improvements, and the extent and character of the area served by the improvements. Upon adoption by the Governing Body by resolution, such technical standards for public improvements shall have such force and effect as if they were fully set forth herein. 4.06 Street Standards: A) General: The following standards shall apply to all streets to be located within the subdivision: 1) Streets shall provide for the continuation of arterial and collector streets from adjoining platted areas,

Sources

  • laserfiche: Ordinances-1995-197 (Ordinances-1995-197.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.