Page 7 of 18
Text read by the vision model; check the PDF for anything that matters.ment in writing. Approval of the preliminary plat shall be effective for a period of eighteen (18) months, unless upon written request of the subdivider, the council, by resolution grants an extension of time, and if the final plat is not filed with the clerk within the period of time specified above, all previous actions of the council with respect to the plat shall be deemed null and void.
SECTION 12. FINAL PLAT. The final plat shall meet the following specifications:
(a) It may include all or only a part of the preliminary plat
(b) The plat shall be drawn to the scale of one inch to one hundred (100) feet and submitted showing the basic information required below.
(c) A transparent reproducible copy and eight (8) prints of the final plat shall be submitted showing the following basic information:
(1) Accurate boundary lines, with dimensions and angles, which provide a survey of the tract, closing with an error of not more than one foot in ten thousand (10,000) feet.
(2) Accurate references to known permanent monuments, giving the bearing and distance from some corner of a lot or block in the city to some corner of the congressional division of which the city, or the addition thereto, is a part.
(3) Accurate locations of all existing and recorded streets intersecting the boundaries of the tract.
(4) Accurate legal description of the boundary.
(5) Street names.
(6) Complete curve notes for all curves included in the plan.
(7) Street lines with accurate dimensions in feet and hundredths of feet with angles to street, alley and lot lines.
(8) Lot numbers and dimensions.
(9) Block numbers, if used.
(10) Accurate dimensions for any property to be dedicated or reserved for public, semi-public or community use.
(11) Location, type, material and size of all markers.
Sources
- laserfiche: Ordinances-1979-81 (Ordinances-1979-81.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.