ordinance

Ordinances-1979-81

Dated May 23, 1979 18 pages Ord. 1979-081, Ord. 81

Open the PDF

Page 6 of 18

Text read by the vision model; check the PDF for anything that matters.
(2) Where combinations of preliminary plats, planned area developments and/or large scale residential developments are filed as one plat, one hundred fifty dollars ($150.00) plus one dollar ($1.00) per lot and/or dwelling unit. SECTION 10. APPLICATION PROCEDURE. Immediately upon the filing of the preliminary application as set out in Section 7 above, the city clerk shall submit one copy to the city attorney, two copies to the city engineer, one copy to the fire chief, one copy to the city council and seven copies to the planning and zoning commission. The city council shall cause the application to be examined in order to assure compliance with the requirements of this ordinance. Upon completion of their examination, the city attorney and city engineer shall file a written report of their recommendations with the commission. The commission shall study the preliminary application and review the application of the owner and also review the reports of the city attorney and city engineer and shall approve or reject the application within thirty (30) days; however, the subdivider may agree to an extension of time. The council shall after receipt of the recommendation of the commission or after the time of extension thereof has passed for the commission, to file the recommendations, make tentative approval or rejection of such preliminary application, the same to be by resolution. SECTION 11. APPROVAL OF APPLICATION. The approval of a preliminary plat by the council does not constitute approval of the subdivision but is merely an authorization to proceed with the preparation of the final plat. In the event the preliminary plat is approved and the final plat submitted does not deviate from the preliminary plat and inspection by the city reveals that all plans and specifications for the construction of improvements as required by the city have been met, the final plat must be approved unless both the city and the owner waive this require-

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.