ordinance

Ordinances-1979-81

Dated May 23, 1979 18 pages Ord. 1979-081, Ord. 81

Open the PDF

Page 16 of 18

Text read by the vision model; check the PDF for anything that matters.
as-built construction plans. Said plans shall show in detail the sanitary sewer, storm sewer, the water lines, and the paving as installed. The plans shall contain a signature block for the approval of the city engineer and until said as-built construction plans with the signature of the city engineer are filed with the city clerk no building permit shall be issued for any lot in the subdivision. SECTION 23. INSPECTION. The city engineer shall cause the installation of all improvements in new subdivisions to be inspected to insure compliance with the requirements of this chapter. The cost of such inspection shall be borne by the subdivider and shall be the actual cost of the inspection of the city. SECTION 24. The Ordinance codified in this title may be amended from time to time by the city council. Such amendments as may be proposed shall first be submitted to the planning and zoning commission for study and recommendation. The commission shall report within thirty (30) days, and failure to do so will be deemed approval of the proposed amendment. The amendment shall become effective from and after its adoption and publication as required by law. REPEALER. All ordinances, or parts of ordinances, in conflict with the provisions of this ordinance are hereby repealed. SEVERABILITY. If any section, provision, or part of this ordinance shall be adjudged to be invalid or unconstitutional, such adjudication shall not affect the validity of the ordinance as a whole, or any section, provision, or part thereof not adjudged invalid or unconstitutional. WHEN EFFECTIVE. This ordinance shall be in effect after its final passage, approval, and publication, as provided by law.

Sources

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.