ordinance

Ordinances-1979-81

Dated May 23, 1979 18 pages Ord. 1979-081, Ord. 81

Open the PDF

Page 15 of 18

Text read by the vision model; check the PDF for anything that matters.
tion for lots and shall be connected to the municipal water system. (b) In the event that the city requires a water main to be greater in size than is needed to service the subdivision itself; then the city shall share in the expense thereof on a pro rata basis. The procedure of such cost-sharing shall be pursuant to the rules and regulations as prescribed by the city council. SECTION 19. SIDEWALKS. A four (4) foot wide concrete sidewalk shall be provided and shall be located such that the line of the inner edge thereof shall be one foot from the property line, except that the city engineer may, upon application modify the location of such sidewalk within an area between the property line and a line running parallel to and four (4) feet in distance from the curb. SECTION 20. MARKERS. An iron rod not less than one-half (\( \frac{1}{2} \)) inch in diameter and twenty-four (24) inches in length shall be placed as follows: (1) At the intersection of all lines forming angles in the boundary of the subdivision. (2) At block and lot corners and changes in direction of block and lot boundaries. (3) At points of curves. SECTION 21. SPECIFICATIONS. The type of construction, the materials, the methods and standards of subdivision improvements shall be equal to the current specifications of the city for like work. Plans and specifications shall be submitted to the city engineer for approval prior to construction, and construction shall not be started until the plans and specifications have been approved. SECTION 22. FINAL PLANS. The subdivider shall provide to the city engineer a transparent reproducible copy of the

Sources

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.