minutes
Minutes-2/9/2000
Page 3 of 3
Text read by the vision model; check the PDF for anything that matters.Engineer Hart also reported that plans are progressing for the IDOT reststop connection for sewer service.
Roadside repairs along Highway# 6 inside the city are being worked on with cooperation from IDOT>
Motion Ryan, second Bartels to authorize Engineer Hart to make arrangements for sidewalk easements along Tif creek to provide for possible future connection of city green areas. Ayes: Bartels, Ryan, Walls, Dils and Gericke. Motion carried.
A request has been received for additional street lighting on the east end of Stetzel Street. This request will be placed on the next city agenda.
Motion Ryan, second Gericke to accept the clerk and treasurer's reports. Ayes: Gericke, Dils, Bartels, Walls, and Ryan. Motion carried. Motion Gericke, second Walls to pay bills and approve receipts. Ayes: Dils, Gericke, Bartels, Walls, and Ryan. Motion carried.
Motion Dils, second Ryan to adjourn. Motion carried. 7:25 p.m.
Glenn R. Potter, Mayor
City of Tiffin
Margaret B. Reihman, City Clerk
Sources
- laserfiche: Minutes-2/9/2000 (Minutes-2-9-2000.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.