minutes
Minutes-11/06/2002
Page 3 of 4
Text from the PDF text layer; check the PDF for anything that matters.Trail system plans have been initially reviewed by IDOT, recommendations received and
plan revisions have been made. The plan will return to IDOT for final review. Dils
indicated that trail work may be expected for letting in perhaps May of 2003.
Abuissa Newman contacted Dils to indicate that a rolling stop sign could be used in the
school crosswalk. Location and permit will need to be obtained from IDOT and paint
markings will need to be in place. Petersen said that West Branch uses a flip down stop
sign. Members said that may be a good option later, but felt initially that a rolling sign
should be used on the highway. It was thought that perhaps the preschool program is
using a safety guard to assist smaller children across the highway.
Petersen suggested a painted crosswalk on Roberts Ferry at the intersection of the Grace
United Methodist Church.
Motion Berner, second Petersen to approve markings, use of caution flashers and
crossing stop sign for Highway 6 if the school can provide personnel for use from 8: 00-
8: 30 am and 3: 15 — 3: 30 pm of schooldays. Ayes: Berner, Reeve and Petersen.
A request for stop sign on Third and Summerhays has been received. Motion Berner,
second Petersen to recommend placement of a stop sign for Third Street for east/west
traffic. Ayes: Reeve, Berner, and Petersen.
Dils continues zoning work on northeast corridor area and residential and commercial
zoning ordinance alterations.
Mud is tracking on street and sidewalk damage caused by improper driveway condition at
330 Main. Residential driveways are regulated under City of Tiffin Design Standards
and the owner should be contacted in this regard.
City employees may have offered to clean mud from recent new sidewalk work, the
owner of property is required to complete mud and dirt removal on sidewalks, backfill
and seeding. Members agreed that city employees have sufficient city work to complete
and should not be taking private tasks across the city and recommend that employees
complete city work.
Sidewalks are badly needed in the old section of Roberts Ferry Road. Considered that
perhaps sidewalk work should be completed jointly with when upgrades are done on this
same road. Roberts Ferry is picking up a lot of traffic, however it will also see many
cement trucks for quite awhile.
Asphalt was placed by city employees on Nightingale, the developer needs to do this
work and complete this work in a satisfactory manner.
Mayor Potter reports that he expects plans for the I-80 exit may be coming in the near
future.
Sources
- laserfiche: Minutes-11/06/2002 (Minutes-11-06-2002.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.