Text from the PDF text layer; check the PDF for anything that matters. CityofTiffin,Iowa
Meeting: Tiffin City Council Meeting
Place: Tiffin City Hall300Railroad St,Tiffin, Iowa, 52340
Date/Time: June 2,2026 7:00p.m.
Web Page: www.tiffin-iowa.org
Posted: May 29, 2026 (website & front entry ofCity Hall)
Mayor: TimKasparek W/WWSuperintendent: BrettMehmen
Council AtLarge: TimOrris MayorPro-Tem D.ofPublicWorks: BrianDetert
Council AtLarge: TonyJohnson Recreation Director: GrantWeber
Council AtLarge: SkylarLimkemann Building Official: BrianShay
Council AtLarge: ChrisOlney Library Director: LizPetersen Grier
Council AtLarge: EricSchnedler InterimFireChief: TomHartshorn
CityAdministrator: DougBoldt CityEngineer: MSAProfessional Services
Asst. CityAdministrator: AshleyPlatz
CityClerk: AbigailHora
CityAttorney: CrystalRaiber
Work Session - Call toOrder 5:30PM
A. Roll Call
TheCity ofTiffin City Council heldawork session Tuesday, June 2,2026, attheTiffin City Hall Council
Chambers. Mayor Kasparek called themeeting toorder at5:30PM. Upon rollbeing called thefollowing
members were present: Chris Olney, Tim Orris, Eric Schnedler, Tony Johnson and Skylar Limkemann
arrived at5:37PM. Others present were City Administrator Doug Boldt, Assistant City Administrator
Ashley Platz andCity Clerk Abigail Hora.
B. Agenda Additions/Agenda Approval
Motion toapprove agenda byOlney.
Second byJohnson.
Allayes, agenda approved.
C. Discussion and Review ofHighway 6Reconstruction Project Staging Plan
Discussion: James Watters was present todiscuss thestaging plans for theHighway 6project. For2027,
Phases 1and2were reviewed. Adetour was expected tobeinplace from March through November.
Construction efforts were tofocus first oncorrecting Croell Ave, while maintaining two-way access toHawk
Wash andTiffin IronTap. Phase 1was designed tomaintain access tothebaseball fields andpark via
Kimberlite St.Southbound traffic from Croell Ave toHighway 6would nothaveaccess from March through
November. The roadway was expected toreopen during thewinter months, with nodetour anticipated from
November through March. For2028, Phase 2was discussed. Adetour was again expected tobeinplace
from March through November. The Croell Ave andKimberlite Stintersections with Highway 6were
planned toremain open, andtheKimberlite Stsignal would remain operational. Due tothemore urbanized
nature ofthis phase ofconstruction, temporary parking along side roads would berequired forresidents.
Access toHighway 6from Main St,Summerhays, South Brown St,and Stephens Stwould beclosed during
construction. Final plans areexpected tobesubmitted totheIowa DOT inJuly, withthe project anticipated
tobebidinOctober. The priority wastocomplete work onCroell Ave during Phases 1and2,followed by
Stephens Stduring Phase 3.Afrequently asked questions (FAQ) document was planned tobedeveloped
prior tothestartofconstruction in2027.
D. Discussion and Review ofKinetic Fiber Network Installation Proposal Matt Graham
Discussion: Matt Graham was present todiscuss Kinetic Fiber's proposal toinstall acitywide fiber-optic
network within Tiffin's public rights-of-way andutility easements. The project would expand access tohigh-
speed internet, increase competition among service providers, and improve reliability forresidents and
businesses. Graham explained that construction methods aredesigned tominimize surface disruption and
that Kinetic would beresponsible forrepairing any damages caused during installation. Theproposal also
includes plans totransition customers from aging copper infrastructure tofiber service andidentifies the
proposed service area within thecommunity.
City Council Agenda Page 1of4