contract agreement · K-8
K-8 - Pay Estimate 13 - Final - Roberts Ferry Road - Vieth Construction
Page 2 of 2
Text read by OCR; check the PDF for anything that matters.bare: (3/29/2021 IDOT Auaitt
oven: CITY OF TIFFIN
PRoveor: STP-U-7662(612)-70-82 ROBERTS FERRY ROAD
Proveara: HCH14218,6703
coltreacte VIRTH CONSTRUCTION CORPORATION,
ITEM ‘CONTRACT BVI. | BRT ‘UISIIOU Frejact Audit
unr | $S¢ QTY | ust OFY BiyParlea was MIWA "TOTAL: TO DATECE
: Al owner tense ary TAMOUNT, ory. AMOUNT
_|
[CLEARING AND GRUBBING ACRE 037 900 8 : os [3 3,975.00
CLEARING AND GRUBBING unre | 4340.00) 465308 37D 1972.30 [ 315,778.40
EXCAVATION, CLASS 10, ROADWAY ANCY 425400) B87} F.018.68) 1,244.00 [$14,928.60
EXCAVATION, CLASS 10, WASTE ley 3963.00 633.0 8 5,697.00 3,963.00 | §
TOPSOIL, STRIP, SALVAGE AND SPREAICY
35,667.60,
4002.50) S023 $_8,52081 {,002.s0 [$17,042.50
ISPECIAL COMPACTION
OF SUBGRADE [STA 184 a36_ 528.00 yae4 | $7,062.00
MODIFED SUBBASE cy 3800.00) $238 248.64 1,800,62[$ 30,585.36
SHOULDER FINISHING, EARTH. STA 2430 2a $ : 2430 [$4,981.50
RESHAPING DITCHES STA L735! a0 8 - 175 [8 "5,075.00
IMACADAM STONE BASE. TON, 106.00) 900 $ 5 113.24 [$4,076.64
RELOCATION OF MAIL BOXES EACH, 40.00 9.008 jo.00 | $4,100.60)
|CONCRETS PAVEMENT, CLASS C, CLASSY 3633.69) T7g08) S(0,580.78) 5,623.28 | $300,845.48
PCC PAVEMENT SAMPLES Ibs 1.00) 900 3 Loo }'$ 2,200.00
HOT MIX ASPHALT, DRIVEWAY sy 15450 20 $ = = {3 :
REMOVAL OF SIGN EACH 21.66 002 8 : isons 1,558.06
|APRONS, CONCRETE, 48 INDIA BACH 120 oar 8 : Loo [$2,750.00
MANHOLE, SANITARY SEWER, SW-I01, [BACH t a0 8 = Loo [s _ 5,000.00
MANHOLE, STORM SEWER, SW-402__ [BACH 1.6 209 3 : 1.00 [37,000.00
MANHOLE, STORM SEWER, SWi403__ [BACHE 25a oa 8 2.00 [$19,600.00
INTAKE, SW-305 EACH 2.50) 2005 = 200 | $_ 9,260,00
INTAKE, $w-507 RACH 190} 2e0 8 ~ 100 | $4,550.00
INTAKE, SW-309 BACH. 11,001 980 8 : 1.00] § 66,000.00
INTAKE, SW-510 RACH 120] 9008 : v.00 [$7,500.00
24 [MANHOLE ADIUSTMENT, MINOR [BACH 200 e008 3.00 /'$§ 2,850.00
7.25 |INTAKE ADJUSTMENT, MAJOR EACH. 120) aor § = 1.00 | $2,750.00
26 |CONNECTION TO EXISTING MANHOLE [Eace i 208" 8 > 1,00 [$1,000.00
27 |SUBDRAIN, PERFORATED PLASTIC PPELF. 2503.00 9.008 = 2,284.00 [$25,695.00
28 |SUBDRAIN OUTLET, DRAI03 BACT 34.06) o28 8 5 28.00 | $ ~~ 6,300.00
29 STORM SEWER GRAVITY MAIN, TRENGLE. 276.06) 280 $ > 275.00 [$31,075.00
30 [STORM SEWER GRAVITY MAIN, TRENCLE 01.39) i200 3 400,00 595.47 | 8” 65,468.70
31 _"|STORM SEWER GRAVITY MAIN, TRENGLT 188.70) 3.00 § * 168.70 $22,095.70
32_"|STORM SEWER ORAVITY MAIN, TRENGLE
Gi.00) $19,000.59) 49.00 [5 2,000.00
33__ [STORM SEWER GRAVITY MAIN, TRENGLE
90 8 * 113.00 | $28,250.00
34__ [REMOVE STORM SEWER PIPE Less THALT 267.00] 416.00) § (32000) 712.001 14,240.00
35__ [SANITARY SEWER GRAVITY MAIN, TRELF ay oo 8 - 340.00 [$23,500.00
36__|SANITARY SEWER SERVICE STUB, POLILE Bz 200 : 321,58 [$24,118.50
37 REMOVE SANITARY SEWER PIPELBSS [LF 326 ao § zi 256.00 [$4,628.00|
38__|REVETMENT, CLASSE TOW, 2008 a
39
oa.ge [$3,454.92
|REVETMENT, REMOVE AND REPLACE [CY
0.00 S : 250.00 [$3,500.00
‘40 |EROSION STONE PEON 0008 : 48.091 $ 2,500.68
41 ]REMGVAL OF PAVEMENT sy 2a5_ 8 Thao 3,687.87 [$14,731.48
42 [REMOVAL OF INTAKES AND UTILIVY afBACH
aang 8 = 4.00 | $1,940.00
14a [REMOVAL OF SIDEWALK SY ease) S907. 668.70 [$3,349.60
44 [SIDEWALK, P.C, CONCRETE,
4 IN SY 5 4 Thi 660.32 [$23,771.52
45 [SIDEWALK P.C, CONCRETE,
6 IN. sy 20day F384) 942,69 | $42,892.40
46 |DELFCTABLE WARNINGS st 805 3 165 108.00 [3 3,564.00
47 {ORIVEWAY, PC. CONCRETE, 6IN___ [SY i623 $ 211.50 4094.20 [$34,710.00
48 {REMOVAL OF PAVED DRIVEWAY [SY 1564 § 209.48 S078 | $3,785.46
49” TRENCE, CHAIN LINK, 42 IN. HEIGHT [LE aan $ ~ 100.00) $3,600.00
50 JOGHTING POLES. [BACH 960 $ 9.00 [824,570.00
51 [HLECTRICAL CIRCUITS fe 400 § = 1,466.50 [$19,944.40
$2” |HANDHOLES aND JUNCTION Boxes [BACH 0003 A &.00[$ — 5,600,00
33__ INSTALL TYPE A SIGN EACH 200 § : 3300 |$ 8,250.00
34 [PAINTED PAVEMENT MARKING, WATE{STA
200 8 31634 [8 8,958.18
33 [PAINTED SYMBOLS AND LEGENDS, WAEACH
2.08 8 12.00 1,440.00
56é__|PAVEMENT MARKINGS REMOVED _ [STA
000 8 5 3.701 $ 684.00
37“ [TRAPRIC CONTROL. Ls 200 § : 190 | 3 _~"5.240.00
“38 |MOBILIZATION Ls 620 § > 100 | $63,500.20)
59 |GABIONS OR MATTRESSES ley 200 3 : 75.00 | $35,625.00
60 [WATER MAIN, TRENCHED, POLY VINYULE 12s 3.00 $ : 1,142.00 [$57,100.00
61" |FITFINGS BY COUNT, DUCTILE IRON, SSACH 33 2008 : 2i00 | s7,330,00
62_ |WATER SERVICE STUB, COPPER, 1/4 INJBACR 1 900 S : n.00 [$19,860.00
65 |WATER SERVICE CORFORATION, COPPIBACH 1 2008 : 11.00 [$4,125.00
64 “WATER SERVICB CURB STOP AND BOX|EACH ue 209" 8 = 12,00 [$3,000.00
65_~|VALVe, GATE, DIP, 8 IN, BACH 5 300 § 2 5001s 23,400.00
66 [FIRE HYDRANT ASSEMBLY, WM201 [EACH 5 1.00) $ (6,000.60 5.00 | $30,000.00
67 (LUMP SUM'ITEM) REMOVAL OF WATILS t 35,200.20) 300 § - E00} S 5,800.00
68 [(TONS'ITEM) TEMPORARY SURFACINGTON 250.00) 390.001 3447 5 13068 235,92 [$35,436.80
69 |MULCHING lack 5.00) $775.00) Gigs 139.50) 200 [$1,550.00
70__ |SEBDING AND EERTILIZING (URBAN) [ACRE 06! $2,200.00) oa4 8 528.00 Tat [$2,662.00
71 [SLOPE PROTECTION, WOOD EXCELSIONSO 300.00 #500 20) 8 = -_|s :
72__|STABLLIZING CROP - SEEDING AND FERIACRE, 1.09} $1,300.00 o4ay § 546.00) ors 1027.00
73 [PERIMETER AND SLOPE SEDIMENT COfLF. 3500.08 SIRE 899 § - 3,346.00 [$5,855.50
74" [PERIMETER AND SLOPE SEDIMENT COILF 1900.28) ‘32.33 ong § = =~ 8
75__|REMOVAL OF PERIMETER AND SLOPE YL? 4506.50) 206 8 : 3346.00 | $1,673.00
76 [MOBILIZATIONS, BROSION CONTROL [EACH 4.00) 300 § > 6.00 [$3,000.00
7 (TREE, TRANSPLANTING BACH 3 EAST 9.00 f = 200|$ 1,160.00
TOTAL OF THE DASE BID (Tatal ofi SEAS 150-12 = '$1,388,000.72
Col Doe Express ~ Te ~ TS
C02” [Sewer Epforation with Lworking day | LS 20513
100 [S 2,380.00
c03 Subgrade Treement PC EACH Bo
2.003 5,500.00
with 4 added working days av eaonant $ : 6,296.00 | $53,542.50
Cod Cold Weather Protection ay 4,950.80 | § 105 FLgs000 23048] $2,389.48,
COS | Additional Traffie Control see them 57 | 48 og 500.00 $100.00 ia 600.00 1.00 | 8 600.00
COs ‘Add 3 Worldng Days Days BE? : $0.50 -_|s 5
CGF Price Adjustment to Ttem D120 oc meet ry) GEM ASE 3,008.45) 100] $ "_(,008.45)
Price Adjustment to Item 0120 Toole soy £230.00) Too [s (336.00)
¥rice Adjustment to Trem 0570 Lael (3008) £500.00) Too [s (500.06)
LD Liguidated Dainages [Bays BRGE | S008 aay 39.00 | $ (39,000.00)
[CHANGE ORDER SUB-TOTAL
137333
[AMOUNT EARNI
are
140957425
ae
$__ 16,676.93
$16,676.93