packet
Packet: Tiffin Regular City Council Meeting (09/01/2026)
Dated September 1, 2026City Council — regular meeting, September 1, 2026 184 pages
Ord. 2026-529, Ord. 2017-398, Ord. 2017-399, Res. 2026-045
Page 40 of 184
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Description</th>
<th>Quantity</th>
<th>LnFt/SqFt/Hr</th>
<th>Unit Price</th>
<th>Total</th>
</tr>
<tr>
<td>79200 Joint Sealants</td>
<td></td>
<td></td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<td>Building 20</td>
<td></td>
<td></td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<td>Vertical precast control joints</td>
<td>818</td>
<td>LnFt</td>
<td>$ 6.00</td>
<td>$</td>
</tr>
<tr>
<td>Soudal foam vertical precast control joints</td>
<td>818</td>
<td>LnFt</td>
<td></td>
<td></td>
</tr>
<tr>
<td>Firecalk vetical precast control joints 1 side</td>
<td>176</td>
<td>LnFt</td>
<td>$ 17.00</td>
<td>$</td>
</tr>
<tr>
<td>Building 10</td>
<td></td>
<td></td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<td>Vertical precast control joints</td>
<td>168</td>
<td>LnFt</td>
<td></td>
<td></td>
</tr>
<tr>
<td>Soudal foam vertical precast control joints</td>
<td>168</td>
<td>LnFt</td>
<td></td>
<td>$11.00 delta<br>$11.00 x 176LF =</td>
</tr>
<tr>
<td>Building 30</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Vertical precast control joints</td>
<td>80</td>
<td>LnFt</td>
<td></td>
<td></td>
</tr>
<tr>
<td>Soudal foam vertical precast control joints</td>
<td>80</td>
<td>LnFt</td>
<td></td>
<td>$1,936.00 cost for fire caulking addition on precast exterior vertical joints</td>
</tr>
<tr>
<td>Lift rental</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
</table>
Quote is for items listed above only. Would use Tremco Dymonic 100 for caulking interior and exterior vertical joints. Foam would be Soudal Soudafoam and Hilti CP606 for firecaulking one side only in required area on Building 20.
All material is guaranteed to be as specified. All work to be completed in workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra cost will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance.
Sources
- revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.