packet

Packet: Tiffin Regular City Council Meeting (09/01/2026)

Open the PDF Searchable PDF tesseract layer

Page 155 of 184

Text from the PDF text layer; check the PDF for anything that matters.
November 2025 IOWA DEPARTMENT OF TRANSPORTATION Preconstruction Agreement For Primary Road Project County Johnson City Tiffin Project Nos. STP-006-7(098)--2C-52 PCC Pavement - Grade & Replace STPN-006-7(101)--2J-52 PCC Sidewalk/Trail BRF-006-7(102)--38-52 RCB Culvert Replacement - Twin Box Iowa DOT Agreement No. 2026-4-131 Staff Action No. This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter designated "DOT”, and the city of Tiffin, Iowa, a Local Public Agency, hereinafter designated "LPA”, in accordance with Iowa Code Chapters 28E.12, 306, 306A and 313.4 as applicable; The DOT proposes to establish or make improvements to U.S. 6 within Johnson County, Iowa; and The DOT and the LPA are willing to jointly participate in said project, in the manner hereafter provided; and The DOT and the LPA previously entered into the following agreement for the above referenced projects: Agreement No. 2025-P-001 for Predesign was executed by the LPA and DOT on March 7, 2025 and March 17, 2025 respectively; and This Agreement reflects the current concept of this project which is subject to modification by mutual agreement between the LPA and the DOT; and Therefore, it is agreed as follows: 1. Project Information a. The LPA shall design; and the DOT shall acquire right of way, let, inspect construction, and perform contract administration for the following described projects in accordance with the project plans and DOT Standard Specifications: STP-006-7(098)--2C-52: Portland cement concrete (PCC) pavement, grade and replace, on U.S. 6 in Tiffin from Grant Street to Park Road. STPN-006-7(101)--2J-52: PCC sidewalk/trail along U.S. 6 in Tiffin from Roberts Ferry Road to Park Road. BRF-006-7(102)--38-52: Reinforced concrete box (RCB) culvert replacement, twin box, on U.S. 6 in Tiffin located 0.2 miles east of Kimberlite Street. See Exhibit A for project location. b. As part of the project, the LPA has requested construction of new storm sewers, water main and associated appurtenances, sidewalk, traffic signals at the intersection of U.S. 6 and Kimberlite Street, widening of the U.S. 6 pavement, and the extension of one existing box culvert within the city of Tiffin 2026-4-131_Tiffin 1

Sheets in this document

  • p. 16 plan sheet
  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.