packet

Packet: Tiffin Regular City Council Meeting (09/01/2026)

Open the PDF Searchable PDF tesseract layer

Page 143 of 184

Text from the PDF text layer; check the PDF for anything that matters.
300 Railroad St. PO Box 259 Tiffin, IA 52340 P. 319-545-2572 F. 319-545-4147 www.tiffin-iowa.org PROCLAMATION BY THE MAYOR OF THE CITY OF TIFFIN Building and Code Staff Appreciation Day September 1, 2026 WHEREAS, building and code professionals play an essential role in protecting the health, safety, and welfare of residents and visitors by ensuring that buildings, structures, and development within our community meet established safety standards; and WHEREAS, building officials, inspectors, plans examiners, code enforcement personnel, and other development services staff work diligently to administer and enforce building codes, zoning regulations, property maintenance standards, and other requirements that contribute to safe, accessible, and well-planned communities; and WHEREAS, these professionals serve as an important resource to property owners, contractors, developers, businesses, and residents, providing guidance and assistance throughout the construction, renovation, and development process; and WHEREAS, effective code administration requires extensive knowledge, continued education, sound judgment, attention to detail, and a commitment to fairness and consistency; and WHEREAS, building and code staff frequently work behind the scenes and in challenging conditions to identify potential hazards, address violations, review plans, conduct inspections, and help ensure that construction and development are completed safely and responsibly; and WHEREAS, strong building and code services help foster public confidence, protect property values, support responsible growth, and contribute to the long-term quality and sustainability of our community; and WHEREAS, the City of Tiffin recognizes the dedication and professionalism of the individuals who serve our community through building inspection, code enforcement, plans examination, zoning, and related development services. NOW, THEREFORE, BE IT PROCLAIMED, that the City of Tiffin, Iowa, hereby recognizes September 1, 2026 as Building and Code Staff Appreciation Day and encourages all residents, businesses, contractors, developers, and community partners to join us in expressing appreciation to the dedicated professionals who help keep our community safe, compliant, accessible, and growing responsibly. BE IT FURTHER PROCLAIMED, that the City of Tiffin extends its sincere gratitude to all building and code staff for their commitment to public safety, professional excellence, and service to our community.

Sheets in this document

  • p. 16 plan sheet
  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.