contract agreement · K-3
K-3 - Pay Estimate 3 - Original Town Phase Two - Rathje Construction
Page 3 of 3
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>ITEM NO.</th>
<th>CONTRACT ITEMS</th>
<th>UNIT</th>
<th>BST QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR'S BID PRICE:</th>
<th>For Projected QTY</th>
<th>AMOUNT</th>
<th>CONTRACTOR'S BID PRICE</th>
<th>TOTAL TO DATE</th>
<th>AMOUNT</th>
</tr>
<tr>
<td colspan="11">NOTES: Items shown in BOLD are the ADDENDUM CHANGES</td>
</tr>
<tr>
<td>1</td>
<td>CLEARING & GRUBBING</td>
<td>UNITS</td>
<td>429.9</td>
<td>$72.00</td>
<td>$31,271.69</td>
<td>579.80</td>
<td>$41,221.60</td>
<td>$57,523.29</td>
<td>$12,271.60</td>
</tr>
<tr>
<td>2</td>
<td>REMOVAL OF ROADWAY AND BORROW</td>
<td>CY</td>
<td>1691.19</td>
<td>$9.00</td>
<td>$15,220.71</td>
<td>100.00</td>
<td>$900.00</td>
<td>100.00</td>
<td>$900.00</td>
</tr>
<tr>
<td>3</td>
<td>EXCAVATION, CLAY, LO. WASTE</td>
<td>LF</td>
<td>211.19</td>
<td>$10.00</td>
<td>$2,111.90</td>
<td>850.00</td>
<td>$8,500.00</td>
<td>850.00</td>
<td>$8,500.00</td>
</tr>
<tr>
<td>4</td>
<td>TOPSOIL, SEEP. SAVAGE & RESHEAR</td>
<td>CY</td>
<td>888.2</td>
<td>$14.00</td>
<td>$12,434.80</td>
<td>200.00</td>
<td>$2,800.00</td>
<td>200.00</td>
<td>$2,800.00</td>
</tr>
<tr>
<td>5</td>
<td>SURFACE PREPARATION</td>
<td>SY</td>
<td>4333.19</td>
<td>$2.00</td>
<td>$8,666.38</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>6</td>
<td>SOILS, FILL, EARTH</td>
<td>LF</td>
<td>149.3</td>
<td>$34.00</td>
<td>$5,016.20</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>7</td>
<td>SOILS, FILL, EARTH</td>
<td>LF</td>
<td>149.3</td>
<td>$34.00</td>
<td>$5,016.20</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>8</td>
<td>REMOVAL OF DOWN PIPE CULVERTS, ARC, SIZE AND TYPE</td>
<td>LF</td>
<td>134.4</td>
<td>$10.00</td>
<td>$1,344.00</td>
<td>192.00</td>
<td>$1,920.00</td>
<td>316.00</td>
<td>$3,160.00</td>
</tr>
<tr>
<td>9</td>
<td>STORM SEWER, TRENCHED, 12 IN. O/A</td>
<td>LF</td>
<td>296</td>
<td>$50.00</td>
<td>$14,800.00</td>
<td>150.00</td>
<td>$7,500.00</td>
<td>150.00</td>
<td>$7,500.00</td>
</tr>
<tr>
<td>10</td>
<td>STORM SEWER, TRENCHED, 18 IN. O/A</td>
<td>LF</td>
<td>425</td>
<td>$32.00</td>
<td>$13,600.00</td>
<td>272.00</td>
<td>$8,704.00</td>
<td>164.00</td>
<td>$16,400.00</td>
</tr>
<tr>
<td>11</td>
<td>STORM SEWER, TRENCHED, 18 IN. O/A</td>
<td>LF</td>
<td>407</td>
<td>$32.00</td>
<td>$12,944.00</td>
<td>288.00</td>
<td>$9,216.00</td>
<td>464.00</td>
<td>$4,640.00</td>
</tr>
<tr>
<td>12</td>
<td>STORM SEWER, TRENCHED, 14 IN. O/A</td>
<td>LF</td>
<td>313.5</td>
<td>$38.00</td>
<td>$11,923.00</td>
<td>381.00</td>
<td>$14,478.00</td>
<td>317.50</td>
<td>$1,215.00</td>
</tr>
<tr>
<td>13</td>
<td>PRESSURE, ASP. 24 IN.</td>
<td>BACH</td>
<td>1</td>
<td>$1,200.00</td>
<td>$1,200.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>14</td>
<td>SUBDRAIN, PERFORATED PLASTIC PIPE, 4 IN. O/A</td>
<td>LF</td>
<td>220</td>
<td>$14.00</td>
<td>$3,080.00</td>
<td>92.00</td>
<td>$1,314.00</td>
<td>84.00</td>
<td>$1,148.00</td>
</tr>
<tr>
<td>15</td>
<td>SUBDRAIN, PERFORATED PLASTIC PIPE, 6 IN. O/A</td>
<td>LF</td>
<td>585</td>
<td>$15.00</td>
<td>$8,775.00</td>
<td>3.00</td>
<td>$45.00</td>
<td>3.00</td>
<td>$45.00</td>
</tr>
<tr>
<td>16</td>
<td>SUBDRAIN OUTLET, CMP, 4 IN. O/A</td>
<td>BACH</td>
<td>23</td>
<td>$210.00</td>
<td>$4,830.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>17</td>
<td>SUBDRAIN OUTLET, CMP, 6 IN. O/A</td>
<td>BACH</td>
<td>23</td>
<td>$210.00</td>
<td>$4,830.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>18</td>
<td>SUBDRAIN, PERFORATED PLASTIC PIPE, 4 IN. O/A</td>
<td>LF</td>
<td>149</td>
<td>$18.00</td>
<td>$2,682.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>19</td>
<td>SUBDRAIN, PERFORATED PLASTIC PIPE, 6 IN. O/A</td>
<td>LF</td>
<td>149</td>
<td>$18.00</td>
<td>$2,682.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>20</td>
<td>WATERMAIN, TRENCHED, 18-1/2 PVC, 6 IN. O/A</td>
<td>LF</td>
<td>149</td>
<td>$18.00</td>
<td>$2,682.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>21</td>
<td>ATTENUS, MIG, 600 GPM</td>
<td>BACH</td>
<td>1</td>
<td>$2,500.00</td>
<td>$2,500.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>22</td>
<td>WATER SERVICE, COPPER, 1 IN. O/A</td>
<td>LF</td>
<td>335</td>
<td>$12.00</td>
<td>$4,020.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>23</td>
<td>WATER SERVICE CORPORATION, 1 IN. O/A</td>
<td>BACH</td>
<td>1</td>
<td>$107.00</td>
<td>$107.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>24</td>
<td>WATER SERVICE CURB STOP AND BOX, 1 IN. O/A</td>
<td>BACH</td>
<td>1</td>
<td>$150.00</td>
<td>$150.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>25</td>
<td>WATER SERVICE CORPORATION, 1 IN. O/A</td>
<td>BACH</td>
<td>1</td>
<td>$150.00</td>
<td>$150.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>26</td>
<td>FIRE HYDRANT ASSEMBLY, VM-400L</td>
<td>BACH</td>
<td>1</td>
<td>$4,700.00</td>
<td>$4,700.00</td>
<td>1.00</td>
<td>$4,700.00</td>
<td>1.00</td>
<td>$4,700.00</td>
</tr>
<tr>
<td>27</td>
<td>MAZE BOX EXTENSION/ADJUSTMENT</td>
<td>BACH</td>
<td>7</td>
<td>$400.00</td>
<td>$2,800.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>28</td>
<td>FIRE HYDRANT ADJUSTMENT</td>
<td>BACH</td>
<td>1</td>
<td>$1,400.00</td>
<td>$1,400.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>29</td>
<td>WATERMETER, SW-400L, 4 IN.</td>
<td>BACH</td>
<td>8</td>
<td>$3,800.00</td>
<td>$30,400.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>30</td>
<td>WATERMETER, SW-400L, 4 IN.</td>
<td>BACH</td>
<td>8</td>
<td>$3,800.00</td>
<td>$30,400.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>31</td>
<td>MANHOLE, SW-400L, 48 IN.</td>
<td>BACH</td>
<td>1</td>
<td>$3,515.00</td>
<td>$3,515.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>32</td>
<td>MANHOLE, SW-400L, 48 IN.</td>
<td>BACH</td>
<td>1</td>
<td>$3,515.00</td>
<td>$3,515.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>33</td>
<td>MANHOLE, SW-400L, 48 IN.</td>
<td>BACH</td>
<td>1</td>
<td>$3,515.00</td>
<td>$3,515.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>34</td>
<td>INTAKE, 500-GAL, MODIFIED</td>
<td>BACH</td>
<td>1</td>
<td>$1,230.00</td>
<td>$1,230.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>35</td>
<td>INTAKE, SW-500L</td>
<td>BACH</td>
<td>1</td>
<td>$1,090.00</td>
<td>$1,090.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>36</td>
<td>MANHOLE ADJUSTMENT, MINOR</td>
<td>BACH</td>
<td>4</td>
<td>$100.00</td>
<td>$400.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>37</td>
<td>REMOVE MANHOLE</td>
<td>BACH</td>
<td>8</td>
<td>$750.00</td>
<td>$6,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>38</td>
<td>REMOVE INTAKE</td>
<td>BACH</td>
<td>8</td>
<td>$750.00</td>
<td>$6,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>39</td>
<td>PARKING, FULL, PER FT/HOUR, BY COUNT</td>
<td>BACH</td>
<td>10</td>
<td>$25.00</td>
<td>$250.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>40</td>
<td>PARKING, FULL, PER FT/HOUR, BY COUNT</td>
<td>SY</td>
<td>11</td>
<td>$38.00</td>
<td>$418.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>41</td>
<td>PARKING, FULL, PER FT/HOUR, BY COUNT</td>
<td>SY</td>
<td>11</td>
<td>$38.00</td>
<td>$418.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>42</td>
<td>PARKING, POL, CLASS 2, DURABILITY 9 IN. THICK</td>
<td>SY</td>
<td>1236.81</td>
<td>$46.00</td>
<td>$56,835.26</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>43</td>
<td>PARKING, POL, CLASS 2, DURABILITY 9 IN. THICK</td>
<td>SY</td>
<td>1237.81</td>
<td>$46.00</td>
<td>$56,835.26</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>44</td>
<td>PARKING, DENSIFIED HEAVY</td>
<td>SY</td>
<td>611.19</td>
<td>$51.00</td>
<td>$31,181.69</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>45</td>
<td>ASPHALT, 30MM, 30MM, 9 IN. THICK</td>
<td>LF</td>
<td>2087.1</td>
<td>$19.00</td>
<td>$39,654.90</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>46</td>
<td>ASPHALT, 30MM, 30MM, 9 IN. THICK</td>
<td>LF</td>
<td>2087.1</td>
<td>$19.00</td>
<td>$39,654.90</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>47</td>
<td>ASPHALT, 30MM, 30MM, 9 IN. THICK</td>
<td>LF</td>
<td>2087.1</td>
<td>$19.00</td>
<td>$39,654.90</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>48</td>
<td>ASPHALT, 30MM, 30MM, 9 IN. THICK</td>
<td>LF</td>
<td>2087.1</td>
<td>$19.00</td>
<td>$39,654.90</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>49</td>
<td>ASPHALT, 30MM, 30MM, 9 IN. THICK</td>
<td>LF</td>
<td>2087.1</td>
<td>$19.00</td>
<td>$39,654.90</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>50</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>51</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>52</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>53</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>54</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>55</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>56</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>57</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>58</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>59</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>60</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>61</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>62</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>63</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>64</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>65</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>66</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>67</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>68</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>69</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>70</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>71</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>72</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>73</td>
<td>REMOVAL OF SIDEWALK</td>
<td>SY</td>
<td>127</td>
<td>$6.00</td>
<td>$762.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>74</td>
<td>TYPE A SIGNS</td>
<td>SF</td>
<td>114.91</td>
<td>$19.00</td>
<td>$2,173.39</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>75</td>
<td>TYPE A SIGNS</td>
<td>SF</td>
<td>114.91</td>
<td>$19.00</td>
<td>$2,173.39</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>76</td>
<td>TYPE A SIGNS</td>
<td>SF</td>
<td>114.91</td>
<td>$19.00</td>
<td>$2,173.39</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>77</td>
<td>TYPE A SIGNS</td>
<td>SF</td>
<td>114.91</td>
<td>$19.00</td>
<td>$2,173.39</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>78</td>
<td>TYPE A SIGNS</td>
<td>SF</td>
<td>114.91</td>
<td>$19.00</td>
<td>$2,173.39</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>79</td>
<td>TYPE A SIGNS</td>
<td>SF</td>
<td>114.91</td>
<td>$19.00</td>
<td>$2,173.39</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>80</td>
<td>TYPE A SIGNS</td>
<td>SF</td>
<td>114.91</td>
<td>$19.00</td>
<td>$2,173.39</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>81</td>
<td>STRUCTURAL CONCRETE</td>
<td>CY</td>
<td>48.5</td>
<td>$600.00</td>
<td>$29,100.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>82</td>
<td>REINFORCING STEEL</td>
<td>LF</td>
<td>3457.1</td>
<td>$2.00</td>
<td>$6,914.20</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>83</td>
<td>ENGINEERING SOIL</td>
<td>CY</td>
<td>1391.0</td>
<td>$110.00</td>
<td>$152,010.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>84</td>
<td>CHUNKY AGGREGATE</td>
<td>CY</td>
<td>463</td>
<td>$2.00</td>
<td>$926.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>85</td>
<td>ASPHALT SUBBASE</td>
<td>CY</td>
<td>1860</td>
<td>$2.00</td>
<td>$3,720.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>86</td>
<td>ASPHALT, 30MM, 30MM, 9 IN. THICK, RIGID PIPE, 8 IN. DIA. WITH DOME GRATE</td>
<td>LF</td>
<td>210</td>
<td>$15.00</td>
<td>$3,150.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>87</td>
<td>MUSCLE, HANDWORK</td>
<td>SF</td>
<td>465</td>
<td>$2.00</td>
<td>$930.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>88</td>
<td>ASPHALT, HANDWORK</td>
<td>SF</td>
<td>1960</td>
<td>$0.75</td>
<td>$1,470.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>89</td>
<td>STEEL PIPE, HANDWORK</td>
<td>LF</td>
<td>251.3</td>
<td>$50.00</td>
<td>$12,565.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="10">TOTAL OF THE ABOVE (SUM of Items 1-89) $1,048,014.84</td>
<td>140,238.49</td>
<td>231,434.59</td>
</tr>
<tr>
<td>CO1</td>
<td>General and Subbase</td>
<td></td>
<td>1.00</td>
<td>$10,000.00</td>
<td>$10,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CO2</td>
<td>Connection of storm lines and roof drains</td>
<td>BACH</td>
<td>2.00</td>
<td>$85.00</td>
<td>$170.00</td>
<td>1.00</td>
<td>$205.00</td>
<td>1.00</td>
<td>$205.00</td>
</tr>
<tr>
<td>CO3</td>
<td>Plumbing Master for storm sewer abandonment</td>
<td>CY</td>
<td>1.00</td>
<td>$1,500.00</td>
<td>$1,500.00</td>
<td>0.50</td>
<td>$750.00</td>
<td>0.50</td>
<td>$750.00</td>
</tr>
<tr>
<td>CO4</td>
<td>Materials Shovel-on-site</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CO5</td>
<td>Materials Shovel-on-site (Daily)</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CO6</td>
<td>Materials Shovel-on-site (Daily)</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CO7</td>
<td>Materials Shovel-on-site (Daily)</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="10">CHANGE ORDER SUB-TOTAL</td>
<td>2,566.00</td>
<td>2,968.30</td>
</tr>
<tr>
<td colspan="10">AMOUNT EARNED TOTAL</td>
<td>142,804.84</td>
<td>234,402.89</td>
</tr>
<tr>
<td colspan="10">TOTAL</td>
<td>115,986.00</td>
<td>301,095.09</td>
</tr>
</table>