bid award · K-4
K-4 - Engineering Services Agreement Proposal, Map and Estimate - Sewer Interceptor Project
Page 4 of 4
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Item</th>
<th>Description</th>
<th>Price</th>
</tr>
<tr>
<td>22 CE</td>
<td>Professional Engineer- Lead Engineer</td>
<td>$115.00</td>
</tr>
<tr>
<td>31 CADD 1</td>
<td>Computer Aided Drafting - Engineering</td>
<td>75.00</td>
</tr>
<tr>
<td>32 CADD 2</td>
<td>Computer Aided Drafting Land Surveyin(</td>
<td>75.00</td>
</tr>
<tr>
<td>40 PE/CA</td>
<td>PE Constr. Observation On-Site</td>
<td>95.00</td>
</tr>
<tr>
<td>41 CA 1</td>
<td>Sr. Construction Admin/On-Site</td>
<td>80.00</td>
</tr>
<tr>
<td>51 LS 1</td>
<td>Land Surveyor-Principal</td>
<td>95.00</td>
</tr>
<tr>
<td>52 LS 2</td>
<td>Land Surveyor-Project Manager</td>
<td>90.00</td>
</tr>
<tr>
<td>53 LS 3</td>
<td>Land Surveyor-Project Surveyor</td>
<td>80.00</td>
</tr>
<tr>
<td>55 PD</td>
<td>Sr.Project Designer-CADD</td>
<td>80.00</td>
</tr>
<tr>
<td>61 OS 1</td>
<td>Sr. Project Coordinator</td>
<td>70.00</td>
</tr>
<tr>
<td>70 GPS 1-Survey</td>
<td>1-Man Survey with GPS Equipment</td>
<td>140.00</td>
</tr>
<tr>
<td>71 GPS 2-Survey</td>
<td>2-Man Survey with GPS</td>
<td>170.00</td>
</tr>
<tr>
<td>74 Survey 2-Man</td>
<td>Two-Man Survey Crew</td>
<td>130.00</td>
</tr>
<tr>
<td>77 Robotic TS 1-Survey</td>
<td>1-Man Survey with Robotic TS</td>
<td>140.00</td>
</tr>
<tr>
<td>78 Robotic TS 2-Survey</td>
<td>2-Man Survey with Robotic TS</td>
<td>170.00</td>
</tr>
<tr>
<td>79 1-Man Survey</td>
<td>1 Man Survey</td>
<td>100.00</td>
</tr>
<tr>
<td>81 Tech 1</td>
<td>Sr. Engineering Technician</td>
<td>70.00</td>
</tr>
<tr>
<td>82 Tech 2</td>
<td>Engineering Technician II</td>
<td>65.00</td>
</tr>
<tr>
<td>101 Expert Prep</td>
<td>Expert Preparation</td>
<td>175.00</td>
</tr>
<tr>
<td>102 Expert Testimony</td>
<td>Expert Deposition / Trial Testimony</td>
<td>300.00</td>
</tr>
<tr>
<td>Mileage</td>
<td>Mileage Reimbursement</td>
<td>0.58</td>
</tr>
<tr>
<td>Printing BW</td>
<td>B&W Copies</td>
<td>0.20</td>
</tr>
<tr>
<td>Printing Color</td>
<td>Color Copies</td>
<td>0.75</td>
</tr>
<tr>
<td>Printing sf</td>
<td>B&W per sq. ft</td>
<td>1.00</td>
</tr>
<tr>
<td>Printing sf Color</td>
<td>Color Printing per sq. ft.</td>
<td>2.00</td>
</tr>
<tr>
<td>Misc Expense</td>
<td></td>
<td>@ COST</td>
</tr>
</table>
Sources
- sharepoint (K-4 - Engineering Services Agreement Proposal, Map and Estimate - Sewer Interceptor Project .pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.