bid award · K-4

K-4 - Engineering Services Agreement Proposal, Map and Estimate - Sewer Interceptor Project

Open the PDF Searchable (OCR) PDF

Page 4 of 4

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Item</th> <th>Description</th> <th>Price</th> </tr> <tr> <td>22 CE</td> <td>Professional Engineer- Lead Engineer</td> <td>$115.00</td> </tr> <tr> <td>31 CADD 1</td> <td>Computer Aided Drafting - Engineering</td> <td>75.00</td> </tr> <tr> <td>32 CADD 2</td> <td>Computer Aided Drafting Land Surveyin(</td> <td>75.00</td> </tr> <tr> <td>40 PE/CA</td> <td>PE Constr. Observation On-Site</td> <td>95.00</td> </tr> <tr> <td>41 CA 1</td> <td>Sr. Construction Admin/On-Site</td> <td>80.00</td> </tr> <tr> <td>51 LS 1</td> <td>Land Surveyor-Principal</td> <td>95.00</td> </tr> <tr> <td>52 LS 2</td> <td>Land Surveyor-Project Manager</td> <td>90.00</td> </tr> <tr> <td>53 LS 3</td> <td>Land Surveyor-Project Surveyor</td> <td>80.00</td> </tr> <tr> <td>55 PD</td> <td>Sr.Project Designer-CADD</td> <td>80.00</td> </tr> <tr> <td>61 OS 1</td> <td>Sr. Project Coordinator</td> <td>70.00</td> </tr> <tr> <td>70 GPS 1-Survey</td> <td>1-Man Survey with GPS Equipment</td> <td>140.00</td> </tr> <tr> <td>71 GPS 2-Survey</td> <td>2-Man Survey with GPS</td> <td>170.00</td> </tr> <tr> <td>74 Survey 2-Man</td> <td>Two-Man Survey Crew</td> <td>130.00</td> </tr> <tr> <td>77 Robotic TS 1-Survey</td> <td>1-Man Survey with Robotic TS</td> <td>140.00</td> </tr> <tr> <td>78 Robotic TS 2-Survey</td> <td>2-Man Survey with Robotic TS</td> <td>170.00</td> </tr> <tr> <td>79 1-Man Survey</td> <td>1 Man Survey</td> <td>100.00</td> </tr> <tr> <td>81 Tech 1</td> <td>Sr. Engineering Technician</td> <td>70.00</td> </tr> <tr> <td>82 Tech 2</td> <td>Engineering Technician II</td> <td>65.00</td> </tr> <tr> <td>101 Expert Prep</td> <td>Expert Preparation</td> <td>175.00</td> </tr> <tr> <td>102 Expert Testimony</td> <td>Expert Deposition / Trial Testimony</td> <td>300.00</td> </tr> <tr> <td>Mileage</td> <td>Mileage Reimbursement</td> <td>0.58</td> </tr> <tr> <td>Printing BW</td> <td>B&W Copies</td> <td>0.20</td> </tr> <tr> <td>Printing Color</td> <td>Color Copies</td> <td>0.75</td> </tr> <tr> <td>Printing sf</td> <td>B&W per sq. ft</td> <td>1.00</td> </tr> <tr> <td>Printing sf Color</td> <td>Color Printing per sq. ft.</td> <td>2.00</td> </tr> <tr> <td>Misc Expense</td> <td></td> <td>@ COST</td> </tr> </table>

Sources

  • sharepoint (K-4 - Engineering Services Agreement Proposal, Map and Estimate - Sewer Interceptor Project .pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.