contract agreement · K-4
K-4 - Change Order 9 - Rathje Construction, Original Town Phase Two
Page 2 of 2
Text read by the vision model; check the PDF for anything that matters.Date: November 5, 2021
To: Ben Carhoff
Project: Tiffin Original Town Urbanization Phase II
Re: COR #10
Rathje # 7187
Ben,
I am hereby submitting the following change order request for installation of 2 roof drain connections for 200 Main St and installation of 1 sump pump connection for 110 2nd St. Both were connected to the 4" subdrain installed at the back of curb of Main St. This includes equipment, time and material.
<table>
<tr>
<th>Item</th>
<th>Description</th>
<th>Qty</th>
<th>Unit</th>
<th>Unit Price</th>
<th>MU</th>
<th>Unit w/ MU</th>
<th>Total</th>
</tr>
<tr>
<td></td>
<td>Installation of Downspout - 200 Main St</td>
<td>2.00</td>
<td>EA</td>
<td>$475.00</td>
<td>0.00%</td>
<td>$475.00</td>
<td>$950.00</td>
</tr>
<tr>
<td></td>
<td>Installation of Sump Line - 110 2nd St</td>
<td>1.00</td>
<td>EA</td>
<td>$475.00</td>
<td>0.00%</td>
<td>$475.00</td>
<td>$475.00</td>
</tr>
<tr>
<td colspan="6">Total</td>
<td colspan="2">$1,425.00</td>
</tr>
<tr>
<td colspan="2">Additional Days Requested</td>
<td>0</td>
<td>EA</td>
<td colspan="3">Total</td>
<td>0.0</td>
</tr>
</table>
Please call if you have any questions.
Respectfully,
Dan Scofield