CHAPTER 161 POST-CONSTRUCTION STORMWATER RUNOFF CONTROL 161.05 ADMINISTRATION. The City Administrator or designee will administer, implement, and enforce the provisions of this chapter. Any powers granted or duties imposed upon the City may be delegated by the City to persons or entities acting in the beneficial interest of or in the employ of the City. 161.06 CITY NOT LIABLE. Nothing contained in the chapter shall will be construed to create or form the basis of any liability on the part of the City, or its officers, employees, or agents for any injury or damage resulting from the failure of responsible parties to comply with the provisions of this chapter or by reason or in consequence of any inspection, notice, order, certificate, permission, or approval authorized or issued or done in connection with the implementation or enforcement of this chapter, or by reason of any action or inaction on the part of the City related in any manner to the enforcement of this chapter by its officers, employees or agents. 161.07 PERMIT REQUIRED. No landowner or developer will receive any construction runoff permit, Building Permit, Provisional Use Permit, Conditional Use Permit or Special Exception Permit without first meeting the requirements of this chapter prior to commencing the proposed activity. 161.08 STORMWATER MANAGEMENT PLAN REQUIRED. No application for development subject to the provisions of this chapter will be accepted unless it includes a stormwater management plan detailing in concept how runoff and associated water quality impacts resulting from the development will be controlled and managed. 161.09 STORMWATER MANAGEMENT PLAN REQUIREMENTS. The Stormwater Management Plan or each development subject to this chapter must: 1. Be prepared by a licensed professional engineer. 2. Indicate whether stormwater will be managed on-site or off-site and, if on- site, the general location and type of BMPs, with clear citation to the Iowa Stormwater Management Manual. 3. Include a signed and dated certification under penalty of perjury by the preparer of the stormwater management plan that it complies with all of the requirements of this chapter and the Iowa Stormwater Management Manual, meets the submittal requirements outlined in the Iowa Stormwater Management Manual, is designed to achieve the City stormwater standards, and that the City is entitled to rely upon the certification as due diligence on the part of the City. 4. Include a scaled map indicating the location of existing and proposed buildings, roads, parking areas, utilities, structural stormwater management and sediment and erosion BMPs. 5. Include a map showing the proposed land use with a tabulation of the percentage of surface areas to be adapted to various uses, drainage patterns, location of utilities, roads, and easements and the limits of clearing and grading. 6. Include a topographic base map, consisting of an appropriately scaled topographic base map of the site which extends an appropriate distance beyond the limits of the proposed development and indicates existing surface water drainage, including (but not limited to) streams, ponds, culverts, ditches, and wetlands; current land use including all existing structures; location of utilities, roads and easements and significant natural and manmade features not otherwise shown. CODE OF ORDINANCES, TIFFIN, IOWA - 1429 -

Sources

  • revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...

This document's details as JSON

Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.