other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 401 of 718
Text from the PDF text layer; check the PDF for anything that matters. CHAPTER 161
POST-CONSTRUCTION STORMWATER RUNOFF
CONTROL
161.01 Purpose 161.12 Issuance of Permit
161.02 Findings of Fact 161.13 Denial of Permit
161.03 Applicability 161.14 Right of Entry
161.04 Playing In 161.15 Required Inspections for Stormwater BMPS
161.05 Administration 161.16 Stop Work Order
161.06 City Not Liable 161.17 Fees
161.07 Permit Required 161.18 Notice of Violation; Administrative Penalties
161.08 Stormwater Management Plan Required 161.19 Misdemeanor and Municipal Infraction Penalties
161.09 Stormwater Management Plan Requirements 161.20 Nuisance
161.10 Compliance Required 161.21 Remedies Not Exclusive
161.11 Maintenance and Repair of Stormwater BMPS 161.22 Appeals
161.01 PURPOSE. It is the purpose of this chapter to:
1. Protect, maintain, and enhance the environment of the City and the public
health, safety, and general welfare of the public by adopting as the City’s standards,
the guidelines established in the Iowa Stormwater Management Manual (hereinafter
referred to as the “standards”) to manage the stormwater runoff to improve water
quality and control the maximum rate of flow to prevent downstream flooding; and
2. Enable the City to comply with the National Pollution Discharge Elimination
System Permit (NPDES) and applicable statutes and regulations for stormwater runoff
through the following objectives:
A. Minimize increases in stormwater runoff from development within
the City limits and fringe area in order to reduce flooding, siltation, increases
in stream temperature, and stream bank erosion and maintain the integrity of
stream channels;
B. Minimize increases in nonpoint pollution caused by stormwater
runoff from development which would otherwise degrade local water quality;
C. Minimize the total annual volume of surface water runoff which
flows from any specific development project site after completion, to not
exceed the pre-development hydrologic regime to the maximum extent
practicable; and
D. Reduce stormwater runoff rates and volumes, soil erosion and
nonpoint source pollution, whenever possible, through establishment of
appropriate minimum stormwater management standards and best
management practices (BMPs) and to ensure that BMPs are maintained and
pose no threat to public safety.
161.02 FINDINGS OF FACT.
1. The United States Environmental Agency’s (EPA) National Pollutant
Discharge Elimination System (NPDES) permit program administered by the State
Department of Natural Resources (IDNR) requires that cities meeting certain
demographic and environmental criteria obtain from the IDNR an NPDES permit for
CODE OF ORDINANCES, TIFFIN, IOWA
- 1425 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.