other · C

Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT

Open the PDF Searchable (OCR) PDF

Page 396 of 718

Text from the PDF text layer; check the PDF for anything that matters.
CHAPTER 160 FLOODPLAIN MANAGEMENT M. Pipeline Crossings. Pipelines crossing rivers and streams shall be buried in the streambed and banks, or otherwise sufficiently protected to prevent rupture due to channel degradation and meandering. N. Maximum Damage Potential Development. All new or substantially improved maximum damage potential development shall have the lowest floor (including basement) elevated a minimum of one (1) foot above the elevation of the five hundred (500)-year flood, or together with attendant utility and sanitary systems, be floodproofed to such a level. When floodproofing is utilized, a professional engineer registered in the State shall certify that the floodproofing methods used are adequate to withstand the flood depths, pressures, velocities, impact and uplift forces, and other factors associated with the two-tenths (0.2) percent annual chance flood; and that the structure, below the two-tenths (0.2) percent annual chance flood elevation is watertight with walls substantially impermeable to the passage of water. A record of the certification indicating the specific elevation (in relation to North American Vertical Datum 1988) to which any structures are floodproofed shall be maintained by the Administrator. Where two-tenths (0.2) percent chance flood elevation data has not been provided in the Flood Insurance Study, the Iowa Department of Natural Resources shall be contacted to compute such data. The applicant will be responsible for providing the Department of Natural Resources with sufficient technical information to make such determinations. 2. Special Floodway Provisions. In addition to the General Floodplain Standards, development within the floodway must meet the following applicable standards. The floodway is that portion of the floodplain which must be protected from developmental encroachment to allow the free flow of flood waters. Where floodway data has been provided in the Flood Insurance Study, such data shall be used to define the floodway. Where no floodway data has been provided, the Department of Natural Resources shall be contacted to provide a floodway delineation. The applicant will be responsible for providing the Department of Natural Resources with sufficient technical information to make such determination. A. No development shall be permitted in the floodway that would result in any increase in the Base Flood Elevation. Consideration of the effects of any development on flood levels shall be based upon the assumption that an equal degree of development would be allowed for similarly situated lands. B. All development within the floodway shall: (1) Be consistent with the need to minimize flood damage. (2) Use construction methods and practices that will minimize flood damage. (3) Use construction materials and utility equipment that are resistant to flood damage. C. No development shall affect the capacity or conveyance of the channel or floodway of any tributary to the main stream, drainage ditch, or any other drainage facility or system. D. Structures, buildings, recreational vehicles, and sanitary and utility systems, if permitted, shall meet the applicable General Floodplain Standards CODE OF ORDINANCES, TIFFIN, IOWA - 1416 -

Sources

  • revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...