other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 356 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 158 SUDAS
length buried vertically to within one-foot of the finished
grade.”
H. 2D-1 D. 13. Add the following
“13. Other Jurisdictional Requirements:
a. No Corrugated PVC or HDPE pipe shall be installed within
the public right-of-way or with easements shared with other
utilities except for subsurface drainage pipes.
b. No corrugated PVC or HDPE pipe shall be used where the
pipe crosses easements used by other utilities.
c. Flared end sections are required at all storm sewer outlets
and shall include IDOT RF-14 ties and rip-rap or other
channel protection as recommended by the City Engineer.”
I. 2G-1 F. 5. Add the following subsection:
“5. Other Jurisdictional Requirements:
Refer to City of Tiffin Ordinances for specific requirements.
a. Dry Hydrant Installation.
1) All wet-bottom detention facilities shall have an
emergency vehicle accessible dry hydrant installed at the
direction of the Fire Chief. All dry hydrants installation sites
will be approved by the Fire Chief and construction drawings
will be approved by the Fire Chief and City Engineer.
2) Figures G-1.02 and 2G-1.03 show typical installation
details.”
CODE OF ORDINANCES, TIFFIN, IOWA
- 1360 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 18, 2026. Built from the archive's documents; see how the data is built.