Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 158 SUDAS
in material costs for mains larger than 12-inches, required for the
future needs of the City, may be approved by Council Action.”
F. 1B-1F. “Jurisdictional Permit” permit shall mean Building Permit
except as required by the Iowa Department of Transportation.
G. 1B-1H. Replace the last sentence of the first paragraph with the
following: Refer to City of Tiffin Ordinance 2012-313 for maintenance
responsibilities.
H. 1D-1 A. 3. Add the following paragraph:
“Copies of the plans submitted by the Project Engineer to the City for
review by the Jurisdictional Engineer shall be full-size (24”x 36”.
The minimum full-size sheet dimensions are 22”X34”. Copies of
plans for bidding may be scalable half-size (11”X17”).”
I. 1E-1 B. 6. Add the following statement:
“The duration of the maintenance bond is three years for all projects
involving public improvements.”
J. 1F-1 A. Add the following paragraph:
“As-built documentation shall be required in the form of a physical set
of paper plans, PDF format, and in AutoCAD DWG format
document. Drawings shall include horizontal and vertical locations of
sewer services, hydrants, valves, fittings, and water services with ties
to the property pins as well as any modifications to the plans made
during construction.”
2. Chapter 2 Stormwater.
A. 2C-3 H. 2. Add the following section:
“7. Other Jurisdictional Requirements.
Castings shall be non-rocking, self-sealing, and meet SUDAS
specifications. The words “STORM SEWER” shall be cast into the
lid. Chimney seals are not required for storm sewer. Concrete spacers
or metal shims shall be the only materials utilized to adjust frame
elevations. Grout must be used to bond and seal frames to adjusting
spacers.
All manholes shall be marked with two metal fence posts to remain in
place until landscaping is complete. In developments, the posts shall
remain in place until landscaping has been completed by the lot
owner.”
B. 2D-1 B. 2. Add the following subparagraphs:
“d. Drainage way easements for overland flow shall be sufficient to
contain the 100-year flow and as a minimum shall include the bottom
width and side slopes of the drainage way and any necessary
overbank areas.”
C. 2D-1 D. 4. c. Add the following statement:
“Where velocities in a pipe greater than 15 feet per second are
calculated, special provisions shall be made to protect against
CODE OF ORDINANCES, TIFFIN, IOWA
- 1358 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 18, 2026. Built from the archive's documents; see how the data is built.