other · C
Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the Public Hearing — Tiffin City Code - DRAFT
Dated September 15, 2026City Council — work session, September 15, 2026 718 pages
Ord. 1983-117, Ord. 2018-437, Ord. 2010-302, Ord. 2012-309, Ord. 2007-288, Ord. 2012-313, Ord. 2007-287, Ord. 2018-433, Ord. 2019-446, Ord. 2012-319, Ord. 69
Page 208 of 718
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 97 USE OF PUBLIC SEWERS
works, processes, equipment, or receiving waters, or which otherwise create a hazard to life or
constitute a public nuisance, the Superintendent may:
1. Rejection. Reject the wastes by requiring disconnection from the public
sewage system;
2. Pretreatment. Require pretreatment to an acceptable condition for discharge
to the public sewers;
3. Controls Imposed. Require control over the quantities and rates of discharge;
or
4. Special Charges. Require payment to cover the added cost of handling and
treating the wastes not covered by existing taxes or sewer charges under the
provisions of Chapter 99.
97.06 SPECIAL FACILITIES. If the Superintendent permits the pretreatment or
equalization of waste flows, the design and installation of the plants and equipment shall be
subject to the review and approval of the Superintendent and subject to the requirements of all
applicable codes, ordinances, and laws. Where preliminary treatment or flow-equalizing
facilities are provided for any waters or wastes, they shall be maintained continuously in
satisfactory and effective operation by the owner at the owner’s expense.
97.07 CONTROL MANHOLES. When required by the Superintendent, the owner of any
property serviced by a building sewer carrying industrial wastes shall install a suitable control
manhole together with such necessary meters and other appurtenances in the building sewer to
facilitate observation, sampling, and measurement of the wastes. Such manhole, when
required, shall be accessibly and safely located, and shall be constructed in accordance with
plans approved by the Superintendent. The manhole shall be installed by the owner at the
owner’s expense, and shall be maintained by the owner so as to be safe and accessible at all
times.
97.08 TESTING OF WASTES. All measurements, tests, and analyses of the
characteristics of waters and wastes to which reference is made in this chapter shall be
determined in accordance with the latest edition of Standard Methods for the Examination of
Water and Wastewater, published by the American Public Health Association, and shall be
determined at the control manhole provided, or upon suitable samples taken at said control
manhole. In the event that no special manhole has been required, the control manhole shall be
considered to be the nearest downstream manhole in the public sewer to the point at which the
building sewer is connected. Sampling shall be carried out by customarily accepted methods
to reflect the effect of constituents upon the sewage works and to determine the existence of
hazards to life, limb, and property. (The particular analyses involved will determine whether a
24-hour composite of all outfalls of a premises is appropriate or whether a grab sample or
samples should be taken. Normally, but not always, B.O.D. and suspended solids analyses are
obtained from 24-hour composites of all outfalls whereas pH’s are determined from periodic
grab samples.)
[The next page is 791]
CODE OF ORDINANCES, TIFFIN, IOWA
- 786 -
Sources
- revize: Tiffin City Code - DRAFT (gFbbE0YR86eHDItZtXhZZqxLfknUlz.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: C Discussion and Review of Tiffin Municipal Code Revisions – Preparation for Setting the...
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.