contract agreement · K-3
K-3 - Pay Estimate 8 - Rathje Construction - Original Town Phase 2
Page 3 of 3
Text read by OCR; check the PDF for anything that matters. DATE: December 23, 2021
owen: CITY OF TIFFIN
PROJECT: Original Town Urbanization Project: Phase Two
PROJECT #; HFCH12218.13123
coNTRACcTC Rathje Construction
ITEM CONTRACT
: & rn in TOUBareSUSAbDENDURTCHANGES) SB ER RRY
a
i QTY
SORE Pay Period HBS
QTY
eS TOTALTODATE
AMOUNT
#2
1 CLEARING & GRUBBING
= 557.80 | § 12,271.60
2 EXCAVATION, CLASS 10, ROADWAY AND BORROW
350,00 | $ 3,150.00 5,078.00 | $ 45,702,00
3 EXCAVATION, CLASS 10, WASTE
200,00 | § 2,200,00 2,082.00 | 5 22,902.00
4 ‘TOPSOIL, STRP, SALVAGE & RESPREAD
$ > 686,00 | & 9,604.00
5 SSUBGRADE PREPARATION
$ 5 4,330.00 | $ 8,660.00
6 MODIFIED SUBBASE
715.21 | $ 26,357.14 1,851.24 | 5 62,942.16
i] SHOULDER FINISH, EARTH
5 - 5 5 -
8 REMOVAL OF KNOWN PIPE CULVERTS, MISC. SIZE AND TYPE
5 - 1,200.60 | $ 12,006,00
9 STORM SEWER, TRENCHED, 22 JN DIA.
$ : 323,00 | § 20,865.00
10 __|STOAM SEWER, TRENCHED, 15 IN DIA.
$ : 498.50 } $ 25,922,00
11__|STORM SEWER, TRENCHED, 18 IN DIA,
$ - 584,50] § 45,006.50
12 __|STORM SEWER, TRENCHED, 24 IN DIA.
5 - 632.50 | § 56,925.00
13___| PIPE APRON, RCP, 24 IN,
$s : 1,00 | § 1,500,00
14__| PIPE APRON GUARD
$ - 1.00} $ 1,350.00
15 SUBDRAIN, PREFORATED PLASTIC PIPE, 4 IN. DIA.
128,00 } $ 1,792.00 1,425.00 | $ 19,950.00
16 __|SUBDRAIN, PREFORATED PLASTIC PIPE, 6 IN. DIA.
80,00} $ 1,200,00 260,00 | $ 3,900.00
17___|SUSDRAIN OUTLET, CMP, 4 IN, DIA j 1,00 | $ 250,00 12,00 | $ 3,000,00
18 _|SUBDRAIN OUTLET, CMP, 6 IN, DIA
$ : 8.00 | $ 2,000.00
19 _|SUBDRAIN CLEANOUT, TYPE B, 24-INCH
$ - - $ -
20 __|WATERMAIN, TRENCHED, DR-18 PVC, 6 IN. DIA.
10,00} § 380.00 1,449.00 | $ 35,062.00
21 FITTINGS, MJ, DIP,G IN. DIA,
3,00 | § 750,00 27.00 | $ 6,750.00
22 ___|WATER SERVICE PIPE, TYPE K COPPER, 1 IN. DIA,
22,00 | $ 1,650.00 214.00 | $ 16,050.00
23 __| WATER SERVICE CORPORATION, 1IN. DIA.
2,00 | § 614.00 16,00 | $ 4,912.00
24 __ [WATER SERVICE CURB STOP AND SOX, 1 IN, DIA.
2,00 | $ 690,00 16,00 | § $,520,00
25 GATE VALVE, MI, 6 IN. DIA,
§ : 17,00 | $ 19,975.00
26 _|FIRE HYDRANT ASSEMBLY, WM-202
$ - 6.00 | $ 28,200.00
27 __|VALVE BOX EXTE
3 : - [3s :
28 FIRE HYDRANT ADJUSTMENT
$ : 1.00 | § 1,400.00
29 __|WATERMAIN CONFLICTS
$ : 10.00 | $ 36,000.00
30 __|WATERMAIN REMOVALS
$ - 1.00 | $ 10,00
31 MANHOLE, SW-401, 48 IN,
$ : 3,00 | $ 10,125.00
32 {MANHOLE, SW-401, 60 IN,
0.25 |§ 1,362.50 1.00 | $ 5,450,00
33 INTAKE, SW-501
4,25 | § 9,775.00 20,00 | $ 46,000.00
34 __| INTAKE, SW-501, MODIFIED
0.25 |S 693.75 |: 4.00|$ 11,100.00
35 __|INTAKE, SW-512
$ - 5.00 | $ 35,250.00
36___ |MANHOLE ADJUSTMENT, MINOR
2,00 | $ 1,000.00 3.00 | $ 1,500.00
37 __| INTAKE ADJUSTMENT, MINOR
§ : - $ -
38 REMOVE INTAKE
$ : 8.00 { $ 6,000.00
39 PATCHES, FULL DEPTH FINISH, BY COUNT
5,00 | § 1,625.00 5.00 | $ 1,625.00
40 [PATCHES, FULL DEPTH FINISH, BY COUNT
5,00] $ 411,50 5.00 | $ 411.50
41 SUBBAS, (PATCHES)
50,00 | $ 750,00 50.00 | $ 750,00
42 __|PAVEMENT, PCC, CLASS C, 3 DURABILITY 9 IN, THICK
856,26 | $ 39,773.28 2,069.26 |S 96,117.13
43 __] PAVEMENT, PCC, CLASS C, 3 DURABILITY 6 IN. THICK
250,00 | $ 12,412,50 749.74 | $ 37,224,59
44 __|PAVEMENT, BRICK/PAVER INLAY
$ : 148.30 [$31,884.50
45 BITUMINOUS BEDDING COURSE
fy - - 3 -
46 CURB AND GUTTER, 36 IN, WIDE, 9 IN, THICK
3 = 1,449.00 | $ 50,715.00
Al PAVEMENT, HMA, STANDARD TRAFFIC, 5 IN, THICK
600,00 | $ 20,520,00 2,255,00 | $ 77,121.00
48 | FULL-DEPFH RECLAMATION 5 by 5 : $ :
49 __|ASPHALESTABHLIZING-AGEAF-IFOAMING} 85 c Ey - : $ -
50 REMOVAL OF SIDEWALK 1324,00 , i 299.20 | & 1,795.20 802.33 | § 4,813.98
REMOVAL OF DRIVEWAY
6.36 | 3 68,60 618.86 | $ 6,188.60
0,50 | $ 750,00 0.50 | $ 750,00
REMOVAL OF PAVEMENT
Fy . 71,50 | $ 1,072.50
750,00 | $ 33,000,00 750,00 | $ 33,000.00
450,00 | $ 22,050.00 480,00 | $ 23,520,00
COMBINED SIDEWALK AND RETAINING WALL
$ : ” $ -
57__| DETECTABLE WARNING
$ : - 13 co
58 DRIVEWAY, PAVED, PCC, 5 IN.
450.00 | $ 22,342.50 479,50 | § 23,807.18
59 ORIVEWAY, GRANULAR
3 “ 72.00 | $ 1,800,00
60__ [SLOPE PROTECTION, WOOD EXCELSIOR MAT
$ * -_ |3 -
G1___|STARILIZAING CROP SEEDING, FERTILIZING, (URBAN}
5 . - 3 =
62___| CONVENTIONAL SEEDING, SEEDING, FERT., AND MULCHING
$ : - $ :
63 __| PERIMETER+SLOPE SEDIMENT CONTAOL DEVICE
9 INCH
$ : 80,00 | $ 200.00
6&4 PERIMETERtSLOPE SEDIMENT CONTROL DEVICE 12 INCH
3 - - 3 :
65__ |REMOVE PERIMETER+SLOPE SEDIMENT CONTROL DEVICE
$ - -_ [5 :
66__| REVETMENT, CLASS D
$ - 10,00 | § 750,00
67 EROSION STONE
$ - - $ :
68 SWPPP MANAGEMENT
03515 700.00 0,50 | $ 1,000.00
it] MOBILIZATION
0,05 | $ 6,050,00 0,90 | $ 108,900.00
70 TRAFFIC CONTROL
0,05 | $ 589,50 0.75 | $ 8,842.50
1 RELOCATION OF MAILBOXES
$ : 6.50 | $ 812,50
72__:|REMOVAL
OF SIGNS
3 : 19.00 | $ 950.00
73___| REMOVE AND REINSTALL SIGNS
Fy : - $ ”
74__|TYPEASIGNS
5 - : 3 -
75 STEEL POSTS FOR TYPE 4 SIGNS
$ - - 3 :
76 UGHT POLES
7,00 | $ 19,250.00 7.00 | $ 19,250.00
vid ELECTRICAL CIRCUITS
500,00 | $ 6,250,00 1,220.00 | & 15,250,00
78___ |HANDHOLES AND JUNCTION BOXES
3,001 $ 2,100,00 3,00 | $ 2,100.00
79___ JPAINTED PAV'T MARKS, WATERBORNE/SOLVENT BASED
$ : - |8 :
80__ [PAINTED PAV'T SYMaOLS, WATERBOANE/SOLVENT BASED
$ : -_ /8 -
Bid Alternate
$3 - “ § -
82 |SFRUCTFURAL-CONCRETS
$ - - 1s -
a2 REINFORCING, STEEL $ - - g -
83 |ENGINEERED-SOu,
Ey - : $ :
84 |GHOKER-AGGREGATE
$ - - [3 :
85 |AGGREGATESUBBASE
a6 [oROER FF TPR SH 7 $ : -~ [3 -
3 - ~ $ ~
8% ‘| MULCH HARDWoOgD
5 - - [3 :
| 88 UTE PIBER- MESH. $ ~ . 8 ~
89 STEEL-PIRE-HANDRAL
$ - : $ :
$ : - $ :
| Rane 00} A : - [3 :
TOTAL OF THE BASE BID (Total of Items 1-46): 31,824,618.96 $242,302.47
FSA ES HES
$1,162,666.24
EOE PPR GS OLR EP Es OS RECT SSE RTE oe NT Se OEE LETS SORA Se Sea EPR OES
COl_ [Geogrid and Subbase Ls 1,00| 3 _(10,000,00' $ - - $ -
Additional Excavation Class 10 cY 674.96) 310.00} $ - 629,80 | 3 6,298.00
Geo-grit SY 6136.00) $3.00 3 : 3,780.00 | $ 11,340.00
Subbase 12-Inch cy ¢ 2070.90 $36.00 § - 1,259.50 | § 45,342.00
Pavement Removal sy 8136.00 $5.00 [FAs 2n'940°680-002! 1,044.50 | $ §,222,50 4,824.50 | $ 24,122.50
CO2_ {Connection of sump lines and roof drains EACH 3,00 | § 685,00 32,055.00 § - 3.00 | 5 2,055.00
CO3__|Flowable Mortar for storm sewer abandonment cy 6.00 | $ 152,25 $913,590 3 - 6,00 | § 913,50
CO4 {Exploratory Excavation LS 1,00} £ 5,283.08 $5,283.08 $ : 1,00 | $ 5,283.08
CO5 {Sanitary Sewer Repairs EACH 3.00 | & 7,500.00 $22,500.00 5 : 3,00 | § 22,500.00
CO6 {Relocate Raw Watermain LF 200.00 | $ 67,00 $13,400.00 § “ 200,00 | $ 13,400,060
CO7_|Sanitary Service exploration Ls 1.00 | 3 2,500,00 $2,500.00 1.00} 3 2,500.00 1.00 | 5 2,500.00
CO8_ [2-Inch Water Service EACH 1.00; 3 3,500.00 $3,500.00 1.00 / 3 3,500.00 1,00 | 3 3,500.00
CO9 {Sump Pump and Roof Drain Connections Ls 1,00 | $ 1,425.00 $1,425.00 1.00;$ 1,425.00 1,00 | § 1,425.00
CO10 {Roof Drains at Fire Station Ls 1,00 | $ 4,250,00 $4,250.00 1.0015 4,250,00 1,00 | § 4,250.00
COli [Intake Throat replacement Ls 1.00 | 3 2,800.00 $2,800.00 100 | 5 2,800.00 1.00 | § 2,800.00
Coiz j|ACC Millings TON 83.331 $ 30,00 $2,499.90 83.3313 2,499.90 83.33 ($ 2,499.50
$ - - $ -
CHANGE ORDER SUB-TOTAL 3 22,197.40 $148,228.98
BOE
TF AESENS RTTRE
AMOUNT EARNED TOTAL
FL SPAS Mea BO ORNGA
Ts REE ESE NG SOR TAME TS REAR LATA
3 264,499,87 5 1310,895.22
Ene ee 7 rater. 5 : ra zt r ened
3 “ 101,000.00 | r 101,000, 00
$ : ae000,00) >
Sree000. 00
$ - ar20,00000 |
a IE 264499.87 5 Rennes