packet
Packet: Tiffin Regular City Council Meeting (09/15/2026)
Dated September 15, 2026City Council — regular meeting, September 15, 2026 138 pages
Ord. 2026-530, Ord. 2025-530, Ord. 2017-398, Ord. 2017-399, Res. 2026-046, Res. 2026-045
Page 101 of 138
Text from the PDF text layer; check the PDF for anything that matters. • Iowa office location(s), if applicable.
• Iowa professional registrations/licenses.
3. Relevant Project Experience
Provide information on at least three projects demonstrating experience relevant to this project
within the last 5-7 years.
For each project, provide:
• Project name and location.
• Client.
• Project size.
• Construction cost.
• Scope of services provided.
• Completion date/status.
• Project team members.
• Description of similarities to the proposed project.
• Client contact information.
At least one project should preferably involve a fire station, emergency services facility, public
safety facility, or similar municipal facility.
4. Proposed Project Team
Identify the individuals who would be assigned to this project, including:
• Project manager.
• Lead architect.
• Civil engineer.
• Structural engineer.
• Mechanical engineer.
• Electrical engineer.
• Other key personnel.
• Proposed subconsultants.
Provide relevant qualifications and experience for each key team member.
5. Approach to the Project
Describe the firm's proposed approach to:
• Site evaluation.
• Fire Department needs assessment.
• Stakeholder involvement.
• Facility programming.
8
Sheets in this document
Sources
- revize: Agenda packet (packet_2026-09-15_eb5a0559-e405-40e9-b1b3-be2c4fe4ae36.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.